Parnassus Heights site
Named in the records1976–2010
143 records of San Francisco tie this place, 1976–2010: 0 decisions of the Board of Supervisors and 143 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 143: 0 Board decisions, 143 facts from city reports
- Years
- 1976–2010
What the records say
The 60 most telling of its 143 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1976 | Parnassus Heights space ceiling · other: space ceiling of 3,550,000 gsf adopted by The Regents | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1982 | Parnassus Heights site · finding: Strong seismic groundshaking expected (Modified Mercalli Intensity VII to VIII); not directly on any known fault trace | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1982 | Parnassus Heights site · finding: Landsliding low to moderate potential | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1984 | Vision Research Laboratory Building · other: geotechnical investigation for the 1984 building | event | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1992 | UCSF Parnassus Heights power plant boilers · other: natural gas use approximately 780 million cf annually (1992) | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1993 | UCSF Parnassus Heights site · other: 0.68 mgd water use (1993) | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1993 | Parnassus Heights site water use · other: used 0.68 million gallons per day of water, 1.1 percent of city total of 63 mgd | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1995 | UCSF Parnassus Heights site traffic analysis · other: City Planning Department growth factor of one percent per year applied, 1995 to 2010 | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Aldea Student Housing, MR IV and UC Hall buildings · proposes: demolition and replacement of Aldea Student Housing, MR IV and UC Hall buildings | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | LRDP demolition and new construction at Parnassus Heights · proposes: Demolition and new construction at Aldea Family Student Housing, UC Hall and MR IV buildings | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site · finding: Not in or near an Alquist-Priolo Earthquake Fault Zone | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights solid waste disposal · other: approximately 1,625 tons annually transported to Altamont Landfill for disposal | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Surge, Woods Buildings and Laboratory of Radiobiology · demolished: demolished and not replaced | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Proctor building · demolished: demolished; site considered for new housing | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Services Building · demolished: MR VI, Central Services Building and Medical Research Annexes demolished to make room for Parnassus Services Building | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Proctor, Surge, Woods and Laboratory of Radiobiology buildings · proposes: demolish four buildings and reduce space by 43,343 gsf | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF demolition at Parnassus Heights · recommendation: prepare PCB and asbestos-abatement plans before demolition | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights construction and demolition solid waste · finding: reduces solid waste disposal effect to less-than-significant levels with recycling plan | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UC Hall · demolished: demolished and replaced by a four- to five-story building | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Woods Building · demolished: demolition not a significant effect | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UC Hall · finding: not a state or city landmark and not on the National Register; demolition not significant | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Zakheim murals, UC Hall · other: to be removed, preserved and reused in a new building | action | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Surge Building · demolished: demolition not a significant effect | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | LRDP demolition and construction projects, Parnassus Heights · finding: no impact on sensitive habitat or species, significant or otherwise | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site · other: served by MUNI bus and light rail lines | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF 1996 LRDP, Parnassus Heights transit (MUNI) · finding: increased MUNI trips from LRDP at Parnassus Heights are a significant unavoidable impact | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Impact 4D-1 construction air pollutant emissions at Parnassus Heights · finding: Significant: construction PM10 emissions would exceed federal and/or state ambient standards | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP Parnassus Heights construction · finding: Construction PM10 emissions would exceed federal and/or state ambient air quality standards | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights site · other: a portion of wastewater flows to the Oceanside Drainage | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights · other: excessive crowding; LRDP provides space to relieve it | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights site · jobs: approximately 8,500 employees | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site parking · other: 2,778 parking spaces in several major facilities | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Residential permit parking near Parnassus Heights site · other: fully occupied in the morning peak hour (95 percent occupied) | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights on-street parking survey · other: more than 1,840 on-street parking spaces surveyed | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights on-street parking survey · other: 52 percent of unmetered spaces have no time limits | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights on-street parking survey · other: 43 percent residential permit parking with two-hour limits | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | On-street parking near Parnassus Heights site · other: 94 percent occupancy in the am peak hour | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights metered spaces · other: 95 percent or more occupied | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Bicycle lanes around Parnassus Heights site · other: no bicycle lanes on streets surrounding the site | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site pedestrian traffic · other: substantial pedestrian traffic on Parnassus Avenue and its crosswalks | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | TDM Expansion mitigation, Parnassus Heights · finding: Significant/Unavoidable: about six percent mode shift from auto needed; shift unlikely during LRDP period | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Impact 4C-2 construction-free corridor traffic, Parnassus Heights · finding: LRDP traffic increase would be less than significant | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Mitigation Measure 4C-2 · finding: None required | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF 1996 LRDP, Parnassus Heights · other: 14 additional parking spaces demand | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF 1996 LRDP, Parnassus Heights · other: increase of 823 daily vehicle trips | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF 1996 LRDP, Parnassus Heights · other: decrease of 446 UCSF staff trips (daily average) | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF 1996 LRDP, Parnassus Heights · other: increase of 1,269 out-patient and visitor users (daily average) | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site power plant · other: existing power plant has four steam boilers, primarily natural gas | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights sensitive receptors · other: UCSF hospitals, outpatient clinics and a child-care center | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights emergency generators · other: four boilers at existing plant and 12 emergency generators emitting air toxics | measure | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Medical Research (MR) IV building · proposes: To be replaced under the LRDP | project | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site · finding: generally acceptable noise environment for medical and educational uses | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP Parnassus Heights construction noise · finding: significant construction noise impacts could result | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF LRDP Parnassus Heights construction noise mitigation 4E-1 · recommendation: limit construction hours to between 7:00 am and 8:00 pm | recommendation | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | UCSF Parnassus Heights site noise survey · finding: Noise limits exceeded along northern and eastern perimeters | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site · other: slopes steeply north at gradients of 25 to 45 percent | site | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site · finding: within the City's Special Geologic Study Area for potential ground failure from landsliding; site-specific slope stability studies required | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1997 | Central Utilities Plant, UCSF Parnassus Heights · built: under construction; projected completion 1997 | building | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 2010 | Parnassus Heights LRDP transit · finding: Peak-hour transit trips would add significant loading on MUNI routes | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
| 1996 | Parnassus Heights site, existing MUNI transit corridor · other: existing overall corridor load factor of 0.92 | finding | City report: Draft EIR : long range development plan, University of California, San Francisco scanned page ↗ |
All 143 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0