Named in the records1972–1998

76 records of San Francisco tie this place, 1972–1998: 0 decisions of the Board of Supervisors and 76 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
76: 0 Board decisions, 76 facts from city reports
Years
1972–1998

What the records say

The 60 most telling of its 76 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1972KEST, Inc. radio tower · approved: radio tower 186 feet in height on top of Pier 46BmeasureCity report: Minor permits granted since ... Commission meeting. 1972
scanned page ↗
1989South Beach Redevelopment Project Area Plan · other: public open space adjacent to Pier 46BmeasureCity report: Building a new home for the San Francisco Giants : a cost-benefit analysis of the proposed China Basin ballpark
scanned page ↗
1989Demolition of four structures on and near Pier 46B · cost usd: approximately $2.0 million to $7.0 million (1989 estimate)measureCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1989Demolition of four structures on and near Pier 46B · cost usd: approximately $2.0 million to $7.0 million (1989 estimate)actionCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1989ballpark site Pier 46B · owned by city: Port of San FranciscositeCity report: Building a new home for the San Francisco Giants : a cost-benefit analysis of the proposed China Basin ballpark
scanned page ↗
1989Pier 46B · cost usd: between $4.2 million and $7.1 million as compensation for lost development optionsmeasureCity report: Building a new home for the San Francisco Giants : a cost-benefit analysis of the proposed China Basin ballpark
scanned page ↗
1989Pier 46B toxic cleanup · cost usd: significantly less than $1 millionmeasureCity report: Building a new home for the San Francisco Giants : a cost-benefit analysis of the proposed China Basin ballpark
scanned page ↗
1989Port maintenance facility relocation · cost usd: up to $7.0 million (1989 estimate)measureCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1989Port maintenance facility relocation · cost usd: up to $7.0 million (1989 estimate)actionCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1992Redevelopment Agency surface parking lot · proposes: 300 space surface parking lot on portions of Pier 46B and Seawall Lot 335projectCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992South Beach surface parking lot · proposes: 300 space surface parking lot proposed by the Redevelopment AgencyprojectCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Pier 46B · demolished: demolition envisioned in conceptual planactionCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Museum and Ships relocation · alternative: relocate the Museum and Ships to Pier 46BalternativeCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Pier 46B · owned by city: Port's Maintenance Department and Yardproperty_recordCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992National Park Service historic ships warehouse and museum space · alternative: Relocation of Park Service facilities to Pier 46B proposed by a citizen's groupalternativeCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Westar Marine Services · use: tug and tow operation (tenant)property_recordCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992HSF Enterprises · other: cargo salvage and distribution company located on Pier 46Bproperty_recordCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Westar Marine Services · use: tug and tow operationsiteCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992HSF Enterprises · use: cargo salvage and distribution companyproperty_recordCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Pier 46B · use: port maintenance operations currently located on the piersiteCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992South Beach Park · proposes: 350 space parking lotprojectCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Port Maintenance Facility · other: currently operates out of Pier 46B; relocation needed for South Beach park and marina developmentbuildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1994Pier 46B · use: Port maintenance operations, berthing and service area for tug and tow vesselsproperty_recordCity report: Draft waterfront land use plan
scanned page ↗
1994Pier 46B · other: Continue to accommodate docking for tug and tow vesselsrecommendationCity report: Draft waterfront land use plan
scanned page ↗
1994Pier 46B · use: Port maintenance operations; berthing and service area for tug and tow vesselsbuildingCity report: Port of San Francisco : draft waterfront land use plan
scanned page ↗
1994Pier 46B · use: Port maintenance and tug and tow operationssiteCity report: Port of San Francisco : draft waterfront land use plan
scanned page ↗
1994Pier 46B · recommendation: Continue to accommodate docking for tug and tow vessels at Pier 46BrecommendationCity report: Port of San Francisco : draft waterfront land use plan
scanned page ↗
1994-06-06Pier 46B · use: Port maintenance and tug and tow operations for yearsproperty_recordCity report: Draft waterfront land use plan
scanned page ↗
1994-06-06Pier 46B, Seawall Lot 336 and Assessor's Block · proposes: Locate possible residential and/or commercial uses along the inland siderecommendationCity report: Draft waterfront land use plan
scanned page ↗
1996Pier 46B structures · demolished: four structures totaling 295,602 square feet must be demolishedproperty_recordCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1996Ballpark use, Pier 46B, Seawall Lots 335 and 336, Assessor's Block 3794 · alternative: ballpark may be an acceptable land use option if Port Commission finds project in best interest of PortalternativeCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Ballpark option, Pier 46B, Seawall Lots 335 and 336, Assessor's Block 3794 · alternative: A ballpark may be an acceptable land use option, if the Port Commission finds it in the Port's best interestalternativeCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Port maintenance facility · floor area sqft: 135,000 square feetbuildingCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1996Port maintenance facility · use: Port central maintenance facility occupying 135,000 square feetproperty_recordCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1996Port tenant relocation at Pier 46B · finding: Port does not anticipate significant expenditures for relocating the ten tenantsfindingCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1996Pier 46B · other: Remove 'Existing Maritime Areas' shading from Pier 46BmeasureCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B planned ballpark site · height ft: 150 feetsiteCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B · proposes: Permit operation of excursion boats, water taxis and other vessels at Pier 46B to complement recreational boating in South Beach HarborrecommendationCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B deck public access area · proposes: south deck of Pier 46B improved as public access area extending PortWalkprojectCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B, Seawall Lots 335 and 336, Assessor’s Block 3794 · proposes: ballpark may be an acceptable land use optionsiteCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B · use: Port maintenance facility and a tug and a tow operationproperty_recordCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B · proposes: Permit excursion boats, water taxis and other vessels to operate at Pier 46BrecommendationCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Pier 46B · proposes: Continue to accommodate docking for tug and tow vessels at Pier 46BrecommendationCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Ballpark, Pier 46B and Seawall Lots 335 and 336 · approved: Requires approval by San Francisco voters at an election, the Bay Conservation and Development Commission, and the California State Lands CommissionactionCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Ballpark, Pier 46B and Seawall Lots 335 and 336 · other: Amend the existing height limit to accommodate the structuremeasureCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Ballpark, Pier 46B and Seawall Lots 335 and 336 · other: Compensation package ensuring a fair market return to the Port for this use of its propertyrecommendationCity report: Port of San Francisco waterfront land use plan : draft for public review and comment
scanned page ↗
1996Giants ballpark · approved: voter approval of Proposition BprojectCity report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan
scanned page ↗
1996-03-04Pier 46B structures · demolished: four structures on or proximate to Pier 46B, totaling 295,602 square feet must be demolishedbuildingCity report: Review of the projected costs and economic benefits associated with the San Francisco Giants' proposed ballpark at China Basin
scanned page ↗
1997Ballpark · rezoned: 40-X to 150-X height and bulk designationmeasureCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Ballpark · rezoned: Maritime to Ballpark land use designationmeasureCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Giants ballpark · proposes: Planned Giants ballpark at Pier 46BprojectCity report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan
scanned page ↗
1997Ballpark Public Access · proposes: Public access walkway extending the length of Pier 46BprojectCity report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan
scanned page ↗
1997Proposed ballpark at Pier 46B · other: The proposed ballpark at Pier 46B and adjacent inland parcels is included in this areaprojectCity report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan
scanned page ↗
1997Northeast Waterfront Plan · other: replace maritime designation with ballpark designationactionCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Ballpark at Pier 46B · proposes: open-air ballpark with a maximum of 45.000 seats and related commercial usesrecommendationCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Maritime piers 35 through 9, 26 through 38 and 46B · recommendation: Continue maritime activities as long as practicalrecommendationCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Ballpark (Pier 46B) · proposes: open-air ballpark, maximum 45.000 seatsprojectCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Ballpark · proposes: ballpark at Pier 46BprojectCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Pier 46B · other: Replace Maritime designation with Ballpark designationmeasureCity report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997
scanned page ↗
1997Ballpark site, Pier 46B · height ft: 150-X height and bulk designation replacing 40'measureCity report: San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998
scanned page ↗

All 76 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0