Pier 70
Landmark1867–2026
594 records of San Francisco tie this place, 1867–2026: 417 decisions of the Board of Supervisors and 177 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Landmark
- Records
- 594: 417 Board decisions, 177 facts from city reports
- Years
- 1867–2026
What the records say
The 60 most telling of its 594 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1867 | Pacific Rolling Mills · built: Pacific Rolling Mills constructed on filled submerged property (Pier 70 site) | event | City report: San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998 scanned page ↗ |
| 1867 | Pacific Rolling Mills · built: constructed on filled submerged property, now Pier 70 | building | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1886 | Pier 70 historic structures · built year: constructed between 1886 and 1944 | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1886 | Union Iron Works Machine Shop/Storage/Foundry · built year: 1886/1914, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1896 | Union Iron Works Office Building · built year: 1896 | property_record | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1896 | Union Iron Works Office Building · built year: 1896, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1900 | Risdon Power House, Electric Shop/Substation No. 5 · built year: 1900, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1912 | Union Iron Works Powerhouse No. 1 · built year: 1912, to be retained and reused | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1912 | Union Iron Works Plate Shop No. 1 · built year: 1912/1936, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1913 | Union Iron Works West Lumber Shed · built year: 1913, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1914 | Union Iron Works Light Warehouse · built year: 1914, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1916 | Union Iron Works Gatehouse · built year: 1916, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1917 | Union Iron Works Office/Warehouse/Substation No. 3 · built year: 1917, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1917 | Union Iron Works Foundry/Concrete Warehouse · built year: 1917, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1917 | Union Iron Works Maintenance/Concrete Warehouse · built year: 1917, identified for further evaluation | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1917 | Union Iron Works Administration Building · built year: 1917, to be retained and reused | building | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1937 | Bethlehem Substation · built year: 1937 | property_record | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1941 | Bethlehem Welding Shop · built year: 1941 | property_record | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1974 | Pier 70 automobile handling facility · built: 10-acre facility for handling automobiles completed | building | City report: San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study scanned page ↗ |
| 1975 | Pier 70 · finding: partially condemned | finding | City report: Final environmental impact report on special area plan for the San Francisco waterfront scanned page ↗ |
| 1982-08-30 | City approved leasing real property at Pier 70 from the Port Commission for cable car storage. | passed | Board decision scanned page ↗ |
| 1987-06-15 | $814,200 (≈ $2.4 million in 2026 dollars) proposed for towed-car storage at 1475 Mission Street and Pier 70; passed first reading only. | passed first reading | Board decision scanned page ↗ |
| 1987-06-22 | $814,200 (≈ $2.4 million in 2026 dollars) for towed-car storage at 1475 Mission Street and Pier 70 | passed | Board decision scanned page ↗ |
| 1994 | Pier 70 · other: Portion is Class III landfill site subject to closure requirements by Regional Board | site | City report: Draft waterfront land use plan scanned page ↗ |
| 1994 | Pier 70 · other: portions are Class III landfill sites subject to Regional Board closure requirements | site | City report: Port of San Francisco : draft waterfront land use plan scanned page ↗ |
| 1994 | Seawall Lot 352 and Pier 70 interim uses · recommendation: Proposed interim uses must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | recommendation | City report: Port of San Francisco : draft waterfront land use plan scanned page ↗ |
| 1994-11-04 | Pier 70 · recommendation: Proposed interim uses must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | recommendation | City report: Port of San Francisco : draft waterfront land use plan scanned page ↗ |
| 1996 | Pier 70 and Seawall Lot 352 landfill sites · other: Class III landfill sites subject to closure requirements by the California Regional Water Quality Control Board | site | City report: Port of San Francisco waterfront land use plan : draft for public review and comment scanned page ↗ |
| 1996 | Pier 70 and Seawall Lot 352 landfill sites · other: Interim land uses restricted to those with no effects on ground water and surface water quality or with engineering controls | measure | City report: Port of San Francisco waterfront land use plan : draft for public review and comment scanned page ↗ |
| 1996 | Seawall Lot 352 and Pier 70 interim uses · other: Interim uses must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | measure | City report: Port of San Francisco waterfront land use plan : draft for public review and comment scanned page ↗ |
| 1996 | Pier 70 and Seawall Lot 352 · other: Class III landfill sites subject to closure requirements by the Regional Board | site | City report: Port of San Francisco waterfront land use plan : draft for public review and comment scanned page ↗ |
| 1996 | Interim uses at Seawall Lot 352 and Pier 70 · other: must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | measure | City report: Port of San Francisco waterfront land use plan : draft for public review and comment scanned page ↗ |
| 1996 | ARG report · recommendation: consideration of potential National Register historic district at Pier 70 | recommendation | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1997 | Pier 70 Waterfront Land Use Plan area · proposes: eighteen acres within the shaded area redeveloped for mixed-use development | project | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1997 | National Register Historic District · proposes: designation of a National Register Historic District will be considered | project | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1997 | Pier 70 Historic Resources Study · proposes: Consider designation of a National Register Historic District | recommendation | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 1997 | Pier 70 Historic Resources Study Area · recommendation: Conduct further research for a possible National Register Historic District, covering mixed-use and maritime-use areas | recommendation | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
| 2008 | Port of San Francisco may accept and spend a $2,280,000 (≈ $3.6 million in 2026 dollars) federal grant to clean up Pier 70. | passed | Board decision scanned page ↗ |
| 2008-01-29 | Port Commission may accept and spend a $200,000 (≈ $312,991 in 2026 dollars) state grant for planning activities at Pier 70. | passed | Board decision scanned page ↗ |
| 2008-10-07 | Port of San Francisco may accept and spend a $2.28M (≈ $3.6 million in 2026 dollars) federal grant to clean up hazardous materials at Pier 70. | passed | Board decision scanned page ↗ |
| 2012-04-03 | Port agreement with BAE Systems to install shoreside power at Pier 70 Drydock #2, up to $5,700,000 (≈ $8.4 million in 2026 dollars), passed on first reading. | passed first reading | Board decision scanned page ↗ |
| 2012-04-10 | The Board finally passed an ordinance letting the Port sign a contract with BAE Systems to install shoreside power at Pier 70 Drydock #2. | passed | Board decision scanned page ↗ |
| 2012-04-10 | Port approved to sign $5.7M (≈ $8.4 million in 2026 dollars) deal for Pier 70 ship power. | passed | Board decision scanned page ↗ |
| 2016-03-01 | Pier 70 public-works district plan | passed | Board decision scanned page ↗ |
| 2016-06-07 | Supervisors adopted a resolution allowing up to $25.1M (≈ $35.2 million in 2026 dollars) in bonds for the Pier 70 infrastructure financing district. | passed | Board decision scanned page ↗ |
| 2017-07-25 | Hoedown Yard district to fund Pier 70 affordable housing, referred | resolution | Board decision scanned page ↗ |
| 2017-11-14 | Pier 70 special use district added to the Zoning Map | ordinance | Board decision scanned page ↗ |
| 2017-11-28 | Hoedown Yard district to fund affordable housing at Pier 70 | resolution | Board decision scanned page ↗ |
| 2017-12-05 | Hoedown Yard district to fund affordable housing at Pier 70 | resolution | Board decision scanned page ↗ |
| 2017-12-05 | Hoedown Yard district for Pier 70 affordable housing, hearing April 17 | resolution | Board decision scanned page ↗ |
| 2018-07-24 | Hoedown Yard district proposed to fund affordable housing at Pier 70 | resolution | Board decision scanned page ↗ |
| 2019-02-26 | $160M (≈ $210.9 million in 2026 dollars) housing bonds approved for Pier 70 homes | passed | Board decision scanned page ↗ |
| 2019-04-09 | Bond money approved to repay Pier 70 costs, including affordable housing | passed | Board decision scanned page ↗ |
| 2020-01-28 | Pier 70 condo special tax set up; no majority protest | passed | Board decision scanned page ↗ |
| 2020-10-06 | Pier 70 map approved, clearing way for 306 homes | passed | Board decision scanned page ↗ |
| 2020-10-06 | Subdivision map proposed for Pier 70 with 306 homes | motion | Board decision scanned page ↗ |
| 2024-03-05 | Pier 70 permission to build into the street sent to committee | resolution | Board decision scanned page ↗ |
| 1994 | Seawall Lot 352 and Pier 70 interim uses · recommendation: Proposed interim uses must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | recommendation | City report: Draft waterfront land use plan scanned page ↗ |
| 1994 | Pier 70 interim uses · recommendation: Proposed interim uses must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board | recommendation | City report: Draft waterfront land use plan scanned page ↗ |
| 1997 | Bethlehem Employment Office · built year: c. 1940 | property_record | City report: The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan scanned page ↗ |
All 594 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0