Terminal Separator Structure
Named in the records1989–2000
52 records of San Francisco tie this place, 1989–2000: 6 decisions of the Board of Supervisors and 46 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 52: 6 Board decisions, 46 facts from city reports
- Years
- 1989–2000
What the records say
All 52 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · adopted: amending Policy 5 under Objective 3, p.1.3.37 | action | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1998 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · adopted: Amendments for the Mid-Embarcadero and Terminal Separator Structure Replacement Project | action | City report: San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998 scanned page ↗ |
| 1998 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · other: amending Policy 5 under Objective 3 | project | City report: San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998 scanned page ↗ |
| 1989 | Terminal Separator Structure · other: razed after 1989 earthquake damage | event | City report: Transportation : an element of the master plan of the city and county of San Francisco scanned page ↗ |
| 1993 | Terminal Separator Structure · other: Provided an elevated connection between I-80 and the Embarcadero Freeway before earthquake damage | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure vacated parcels · demolished: parcels north of Folsom Street and east of Essex Street vacated with removal of Terminal Separator Structure | site | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure vacated blocks · demolished: blocks vacated by demolition of Terminal Separator Structure | site | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure (TSS) · proposes: Caltrans plans to fully rebuild the Terminal Separator Structure | project | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure · other: Terminal Separator Structure north and south of Howard Street | project | City report: Transit terminal study scanned page ↗ |
| 1993 | The Mid-Embarcadero and Terminal Separator Structure · other: environmental review must account for potential new land uses | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Area bounded by Fremont, Folsom, Harrison and former Terminal Separator Structure · stories: generally not higher than four stories | building | City report: Transit terminal study scanned page ↗ |
| 1993 | Second Street buildings west of former Terminal Separator Structure · height ft: generally less than 100 feet high | building | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure · other: options for the Terminal Separator Structure could be affected by any alternative | site | City report: Transit terminal study scanned page ↗ |
| 1993 | Mid-Embarcadero and Terminal Separator Structure · recommendation: environmental review process may need to be modified to account for the selected land use program | recommendation | City report: Transit terminal study scanned page ↗ |
| 1993 | The Mid-Embarcadero and Terminal Separator Structure · finding: possible obstacles to implementation including potential impacts on project schedules | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure · proposes: City of San Francisco proposing to examine alternative designs for replacement of the Terminal Separator Structure | project | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Mid-Embarcadero Roadway and Terminal Separator Structure · finding: Alternatives A and B would have environmental review schedules affected by these projects | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure · recommendation: Timely decisions needed to narrow TSS alternatives and eliminate those with Main and Beale ramps to allow Alternative B | finding | City report: Transit terminal study scanned page ↗ |
| 1994-01-24 | Study of Embarcadero structure rebuild options sent to committee. | pending | Board decision scanned page ↗ |
| 1994-02-14 | Study of options other than full rebuild of Embarcadero freeway ordered. | passed | Board decision scanned page ↗ |
| 1994-02-14 | Freeway study adopted, with added road options for northern neighborhoods. | passed | Board decision scanned page ↗ |
| 1994-02-14 | Embarcadero freeway rebuild alternatives study adopted. | passed | Board decision scanned page ↗ |
| 1994-02-14 | Amendment dropping two freeway options from study turned down. | rejected | Board decision scanned page ↗ |
| 1995 | Embarcadero Freeway and Terminal Separator Structure · event: removed after earthquake damage to elevated freeway structures | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure · event: demolished, providing additional vacant land around the Transbay Transit Terminal | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure · other: Provided elevated connection between I-80 and Embarcadero Freeway before earthquake damage | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure replacement · other: replacement alternatives in EIR/EIS; FHWA and Cal Trans concurred in Board-approved approach | project | City report: Final status report on CAO projects/departments prior to my retirement scanned page ↗ |
| 1995 | Two small islands of Downtown Support District · use: Downtown Support District (C-3-S islands) | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Folsom Street corridor (former Terminal Separator Structure) · height ft: 80-X height and bulk district | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure · proposes: replace elevated Embarcadero Freeway and ramp connection with new roadway, freeway ramps and street improvements | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure · proposes: Terminal Separator Structure would not be rebuilt | alternative | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Embarcadero Freeway, Terminal Separator Structure, Central Freeway · other: city position not to replace these structures | recommendation | City report: Transportation : an element of the master plan of the city and county of San Francisco scanned page ↗ |
| 1995 | Terminal Separator Structure · rejected: decision not to proceed with a full rebuild | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995-10-10 | A resolution endorsing a preferred design to replace the Mid-Embarcadero Terminal Separator structure was referred to committee. | referred | Board decision scanned page ↗ |
| 1996 | Alternatives to Replacement of the Embarcadero Freeway and the Terminal Separator Structure · approved: DPT Variant Alternative | project | City report: City College of San Francisco Chinatown/North Beach campus : draft environmental impact report scanned page ↗ |
| 1996 | Embarcadero Freeway and Terminal Separator Structure report · other: report used as source for existing freeway and ramp conditions | event | City report: Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard scanned page ↗ |
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · proposes: Replace mid-section of Embarcadero Freeway with a split surface roadway | alternative | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · proposes: Supplant the ramp structures | alternative | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · finding: would conform to the General Plan with the proposed amendments | project | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1998 | Alternatives to Replacement of the Embarcadero Freeway and the Terminal Separator Structure FEIR · finding: cumulative traffic conditions based on mitigations identified in the Embarcadero FEIR | finding | City report: City College of San Francisco Chinatown/North Beach campus : comments and responses scanned page ↗ |
| 2000 | Mid-Embarcadero Roadway/Terminal Separator Structure · other: replaced Embarcadero Freeway with a surface roadway; completed | project | City report: Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement scanned page ↗ |
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · other: amended Policy 4 Ferry Building under Objective 25 and Policies 1 and 2 Embarcadero [name withheld] under Objective 27 | action | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1997 | Mid-Embarcadero and Terminal Separator Structure Replacement Project · approved: Preferred Alternative selected by Board of Supervisors through Resolution 100-96 | action | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1993 | Terminal Separator Structure (TSS) alternatives · alternative: six alternatives to the Caltrans TSS proposal identified in City Planning report | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Terminal Separator Structure report · lead agency: Department of City Planning | agency | City report: Transit terminal study scanned page ↗ |
| 1995 | Terminal Separator Structure report · event: Completed by the Planning Department and Board took action before September deadline | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Embarcadero Freeway · other: earthquake damage and subsequent removal of elevated freeway structures and Terminal Separator Structure | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Transbay Terminal Separator Structure · event: Board of Supervisors unanimously passed resolution requesting study of alternatives to rehabilitation of the Terminal and reconstruction of the Terminal Separator Structure | event | City report: Transit terminal study scanned page ↗ |
| 1995 | Transbay Terminal rehabilitation and Terminal Separator Structure · other: Board of Supervisors resolution requesting Caltrans study alternatives to rehabilitation of the Terminal and reconstruction of the Terminal Separator Structure | action | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Transbay Transit Terminal and Terminal Separator Structure issues · event: Board of Supervisors to report back to Caltrans on its position | event | City report: Transit terminal study scanned page ↗ |
| 1997 | Final EIR for Alternatives to Replacement of the Embarcadero Freeway and Terminal Separator Structure · finding: certified as complete by the Planning Commission | event | City report: San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997 scanned page ↗ |
| 1993 | TSS alternatives decision · event: Board of Supervisors expected to narrow the range of TSS alternatives | event | City report: Transit terminal study scanned page ↗ |
All 52 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0