Transbay Terminal Building

Named in the records1992–1998

12 records of San Francisco tie this place, 1992–1998: 0 decisions of the Board of Supervisors and 12 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
12: 0 Board decisions, 12 facts from city reports
Years
1992–1998

What the records say

All 12 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1992Transbay Terminal building · finding: Needed substantial upgrades to meet current seismic and other fire/life/safety codes after the 1989 Loma [name withheld] earthquakefindingCity report: Transbay area plan : background data report
scanned page ↗
1992Transbay Terminal building · cost usd: about $34 million for basic upgrades (1992 State Architect study)buildingCity report: Transbay area plan : background data report
scanned page ↗
1993Transbay Terminal MUNI/SamTrans loading areas · other: MUNI/SamTrans loading areas depressed by 2 feetbuildingCity report: Transit terminal study
scanned page ↗
1993Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: A total of 78 spaces can be accommodated off-street, including 9 MUNI/SamTrans spaces; 82 platforms needed; four spaces on streetfindingCity report: Transit terminal study
scanned page ↗
1993Alternative 3 (Alternative X) Transbay Terminal · other: MUNI and SamTrans continue to use existing loading areas in front of terminal buildingalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative 1 - Expand the Existing Terminal Building To Mission Street · alternative: Expand the existing Transbay Terminal Building to Mission Street for long-haul bus servicesalternativeCity report: Transit terminal study
scanned page ↗
1993Transbay Terminal Building · other: Increase bus loading platforms in existing building from 39 to 53buildingCity report: Transit terminal study
scanned page ↗
1993Transbay Terminal expanded area · other: Additional 16 platforms can be provided in the expanded areabuildingCity report: Transit terminal study
scanned page ↗
1993Transbay Terminal expanded terminal · other: Expanded terminal will be 6-8 feet higher than the existing bus deckbuildingCity report: Transit terminal study
scanned page ↗
1993Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: Total clearance need is at least 28 feet; elevation difference between bus deck and street level is only 20 feetfindingCity report: Transit terminal study
scanned page ↗
1998MUNI bus route 108 special service · event: Special bus service from Transbay Terminal to Treasure Island, 9:30 AM departureactionCity report: Treasure Island and Yerba Buena Island
scanned page ↗
1995Alternative X · alternative: Modified existing Terminal building by adding a second bus deck; rail needs accommodated undergroundalternativeCity report: Transbay area plan : background data report
scanned page ↗

All 12 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0