Qipudata
San Francisco · v0.7.1
qipu data›San Francisco›Places›UCSF Parnassus Heights

UCSF Parnassus Heights

Named in the records1988–2020

101 records of San Francisco tie this place, 1988–2020: 1 decision of the Board of Supervisors and 100 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
101: 1 Board decision, 100 facts from city reports
Years
1988–2020

What the records say

The 60 most telling of its 101 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1988UCSF Parnassus Heights research and teaching · finding: Cancer risk from research and teaching of 0.48 in one millionfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1988UCSF Parnassus Heights research and teaching · finding: Neither acute nor chronic non-cancer hazard index exceeded onefindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1992UCSF Parnassus Heights power plant boilers · other: natural gas use approximately 780 million cf annually (1992)measureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1993UCSF Parnassus Heights site · other: 0.68 mgd water use (1993)measureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1993UCSF Parnassus Heights · population: Estimated patients and visitors average daily population 1993/94: 5,350measureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1995UCSF Parnassus Heights site traffic analysis · other: City Planning Department growth factor of one percent per year applied, 1995 to 2010siteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights building demolition · recommendation: UCSF would implement measures for safe handling and proper disposal of asbestos and PCBs (Mitigation Measure 4F-5, less than significant)recommendationCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights building demolition · recommendation: hire contractors for environmental site assessments for asbestos before demolitionrecommendationCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights buildings to be demolished · other: environmental site assessments for PCBs in buildings to be demolishedmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights solid waste disposal · other: approximately 1,625 tons annually transported to Altamont Landfill for disposalfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP · units: reduce student housing by as many as 14 unitsmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996MR IV Building, Surge Building, Woods Building · finding: demolition would not be considered a significant impact (Impact 4L-2)findingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Surge Building and Woods Building · proposes: demolitionbuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF [name withheld] · proposes: demolition of MR I/II, Medical Research Annex I, MR IV and [name withheld] buildingsprojectCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · other: a portion of wastewater flows to the Oceanside DrainagesiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · jobs: approximately 8,500 employeessiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights long range development plan site · other: Chapter assesses potential environmental effects of LRDP implementation at Parnassus HeightsprojectCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights net new daily vehicle trip generation · other: Total average weekday net new trips 823findingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights net new daily vehicle trip generation · other: Patients average weekday net new trips 763findingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights net new daily vehicle trip generation · other: Visitors average weekday net new trips 506findingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights net new daily vehicle trip generation · other: Total PM peak-hour net new trips 86 (inbound 30, outbound 56)findingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights net new daily vehicle trip generation · other: Peak-hour percentages likely overstate peak-hour impacts of patients and visitorsfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights sensitive receptors · other: UCSF hospitals, outpatient clinics and a child-care centersiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights existing power plant · finding: maximum MEI cancer risk 2.4 in one million from existing power plant and generatorsfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights existing power plant · finding: total chronic hazard index lower than 1.0, non-cancer effects not significantfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights emergency generators · other: four boilers at existing plant and 12 emergency generators emitting air toxicsmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights hospital, research and teaching uses · finding: Maximum cancer risk for the MEI of 4.7 in one million, with ethylene oxide abatement devices installedfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights research and teaching · finding: Increase of 0.06 in one million, to 0.54 in one million total cancer risk from research and teachingfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights boilers and emergency generators · finding: Odor complaints from individuals at Parnassus Heights, including Moffitt Long HospitalsfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights campus · floor area sqft: about 760,000 gsf of research space, or approximately 424,000 asfsiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights noise limits · other: Operational noise not to exceed 50 dBA at night and 55 dBA during the day at nearby residencesmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site noise survey · finding: Noise limits exceeded along northern and eastern perimetersfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · floor area sqft: reduction of approximately 46,000 gsfsiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · population: average daily population from about 15,400 to about 16,000, net change of 600siteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · jobs: decrease of 424 employeessiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · population: estimated increase in outpatients and visitors of 1,024siteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights solid waste · other: approximately 2,500 tons annually, about 0.2 percent of San Francisco totalfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights average daily population · population: approximately 15,400 average daily populationsiteCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP · floor area sqft: reduction of 46,000 gsf of spacemeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP · population: increase of 600 average daily populationmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP · jobs: reduce UCSF staff by 424 employeesmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Central Utilities Plant, UCSF Parnassus Heights · other: two gas turbines expected to consume approximately 1.2 billion cf natural gas annuallybuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · other: average wastewater generation approximately 0.62 mgdmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · other: electricity use averages between 6 and 13 MWmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Central Utilities Plant, UCSF Parnassus Heights · other: steam generation capacity increased from 250,000 to 260,000 lb/hrbuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Central Utilities Plant, UCSF Parnassus Heights · other: electrical cogeneration capacity from 1.6 MW to 10-12 MWbuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Central Utilities Plant, UCSF Parnassus Heights · other: total electrical service capacity increased from 12 MW to 25 MWbuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996Central Utilities Plant, UCSF Parnassus Heights · other: additional 6 MW emergency electrical generation capacitybuildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP space reduction · floor area sqft: reduce research, clinical and administrative space by approximately 46,000 gsfmeasureCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights staffing · jobs: UCSF staff reduced by 424 personsfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights water demand · other: water demand reduced by about 10,200 gpdfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights total water demand · other: total water demand from 0.68 mgd to 0.67 mgdfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · finding: relatively unobstructed views of the site from Kezar DrivefindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · finding: short-range views of the site from Parnassus Avenue and Judah StreetfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · finding: expansive views of the city, the Bay, the Pacific and Golden Gate Bridge from Parnassus AvenuefindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights site · finding: more distant views of the site from the Upper Haight area near Stanyan StreetfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP development · finding: UCSF is constitutionally exempt from Proposition K but would use the ordinance as a basis for evaluating shadow impactsfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights LRDP · finding: beneficial visual impact; more open space and less intensive developmentfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1997Central Utilities Plant, UCSF Parnassus Heights · built: under construction; projected completion 1997buildingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗
1996UCSF Parnassus Heights campus · population: drop of 426 staff at build-outfindingCity report: Draft EIR : long range development plan, University of California, San Francisco
scanned page ↗

All 101 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0