Report recommendations-3dadafd843f6
“A full service Main Library to be located in the San Francisco Civic Center, 442,500 total gross square feet, and $120,468,000 total project cost (begin construction 1992).”
Scan 10Records › City reports › San Francisco new main library (1988)
San Francisco new main library : bond program report
A study by the Department of Public Works on the bond-funded plan for a new San Francisco Main Library, covering its size, cost and design. Scan on the Internet Archive ↗
“[name withheld]” stands for a name the release withholds (Privacy).
Printed words Quoted from the page as read from the scan.
Report recommendations-3dadafd843f6
“A full service Main Library to be located in the San Francisco Civic Center, 442,500 total gross square feet, and $120,468,000 total project cost (begin construction 1992).”
Scan 10
Scan 12Findings-23d401a9751a
“Fifteen new branches were constructed since 1950, and like the system’s other branches, they are totally dependent on the Main Library facility for books, information and public services.”
Scan 12Findings-b8ae89b14c68
“The collection has more than doubled, increasing from the building’s capacity of 500,000 volumes, to more than one million volumes.”
Scan 12Findings-c05c07cf776a
“Last year the San Francisco Fire Department required the closing of the Main Library in order to move "excess" books out of the building.”
Scan 12Findings-f930bb6fcf4b
“Although patronage has increased significantly, seating has decreased by approximately 50% to make more room available for the collection.”
Scan 12Findings-687cc8f33844
“It would not allow for any future expansion, and would require closing the Main Library for up to two and a half years.”
Scan 14Findings-6f315b837957
“All four studies of the Main Library facility have reached the same conclusion; it is not feasible to remodel and expand the existing building.”
Scan 14Findings-e30598e3fb6b
“The most recent study, conducted by Becker and Hayes, Inc; Omni Group, Inc. in 1986, indicated that a remodel ing/expansion would result in a building which is not quite as good and costs almost as much as a new facility.”
Scan 14Report recommendations-e69a358585c2
“Building the new Main Library is essential to achieving this goal.”
Scan 14Findings-792d271b69ba
“An existing one-story building, built in 1940, occupies the eastern portion of the block and is used by the City as office space.”
Scan 18Findings-ed9416ba72ac
“In its existing configuration, the Marshall Square site contains approximately 2.0 acres of land.”
Scan 18Backgrounds-451ba3be3fde
“The 1986 "Functional and Space Requirements Report" ([name withheld] and Hayes, Inc.; Omni Group Inc.) outlined and defined space requirements for the new Main Library.”
Scan 22Report recommendations-4ff882740fe2
“Numerous modifications have been recommended and the following program summary reflects those revisions for current and projected space and functional needs for the Main Library.”
Scan 22Report recommendations-620cc785405f
“Facility capacity associated with these needs is estimated to be 355,200 net square feet (NSF).”
Scan 22Report recommendations-13d92642b180
“The new building, therefore, is assumed to be generally symmetrical with the existing library relative to the formal east/west axis of City Hall.”
Scan 26Report recommendations-2aa257194cc0
“The conceptual design presented in this report provides for a five story building complying with these functional and aesthetic requirements.”
Scan 26Report recommendations-027b9bebcde1
“The conceptual design for the new Main Library includes the relocation of the existing service ramp to Brooks Hall.”
Scan 28Report recommendations-1ff8bc32cd8d
“Public entrances to the building are proposed from Larkin and Fulton Streets with a separate staff entrance from Grove Street.”
Scan 28Report recommendations-29073ab09965
“Space on Levels Two through Four has been assigned to the circulating collection and other reference, stack, reading and staff areas.”
Scan 28
Scan 28Report recommendations-fff809ab90a9
“The conceptual design for the new Main Library retains the Pioneer Monument at its present location on the southeast corner of the site.”
Scan 28Report recommendations-6e007db945b9
“FACILITY DESIGN for relocating the monument to another Civic Center site to be determined by the City.”
Scan 30Report recommendations-a25e930cfbb1
“Exterior walls and stairways will be granite to match the existing Main Library Building and other buildings within the Civic Center area.”
Scan 30Report recommendations-ab0b83cd2647
“If the Fulton Mall project is approved, the landscaping proposed along the northerly side of the site will conform with the proposed design for the mall area.”
Scan 30Report recommendations-e4c6d70b7851
“Open space areas around the building will be appropriately landscaped in a manner and style to match existing landscape along Larkin and Fulton Streets.”
Scan 30Report recommendations-a1a035215cfb
“The conceptual design for the building assumes a structural steel framing system.”
Scan 58Report recommendations-abf25996e01c
“The conceptual design proposes the roof configuration to be a combination of flat roofs and sloped mansard roofs, a design style established for other Civic Center buildings.”
Scan 58Report recommendations-c6be1ca24f22
“The new building will be fully equipped with an automatic fire sprinkler system.”
Scan 58Report recommendations-dc83da116677
“Granite veneer is proposed for all exterior wall surfaces of the building.”
Scan 58Report recommendations-e6fa4932386b
“A halon system (gas operated) is proposed for select areas such as the rare book and document rooms where materials are determined to be irreplaceable.”
Scan 58Report recommendations-3a8454f2fe17
“Finishes proposed for these areas may include carpet tile floors, gypsum board partitions and acoustically treated ceilings.”
Scan 60Report recommendations-3fcbe10c90b3
“An $800,000 (1988 dollars) per annum cost for lighting, power, air conditioning and heat is anticipated beyond that currently expended in the existing facility.”
Scan 68Report recommendations-476ec4bb3885
“In summary, it is predicted that annual operating expenses expressed in today’s dollars will be approximately $7.5 million.”
Scan 68Findings-4bb97c0b0857
“The current operating cost is approximately $6,607,000 per year, and includes staffing costs as well as expenditure for energy, cleaning, etc..”
Scan 68Identifier ia:C124891228