“Muni proposes to connect the present terminal of the J-Church streetcar line at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.”
Scan 6Records › City reports › Muni J Line connection project, San Francisco, California (1982)
Muni J Line connection project, San Francisco, California : draft environmental impact statement
A draft environmental impact statement by the U.S. Department of Transportation on routes for connecting the J-Church Muni line to Metro Center. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Report recommendations-63f97e858f2b
“Muni proposes to connect the present terminal of the J-Church streetcar line at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.”
Scan 6Report recommendations-9c9448ccffe3
“Revenue service would provide a connection linking the Mission District with the southern portion of the City.”
Scan 6Report recommendations-eb5b76cc9ded
“Muni also proposes operationally to interline the J and M lines to form a loop route.”
Scan 6Findings-611990c008bf
“None of the alignments would affect any designated landmark or known archaeological site or properties on or eligible for the National Register at Historic Places.”
Scan 34Findings-f2d78b35a4bc
“None of the proposals would displace or relocate businesses or residential structures.”
Scan 34
Scan 49Findings-7837dd9e2a9c
“The M line and BART have attracted so much patronage away from the 26X that it has been discontinued.”
Scan 64Report recommendations-1d612e2b16e5
“If six-minute headways were maintained the entire length of the J line, an additional six vehicles would be needed (plus a spare).”
Scan 93
Scan 93Report recommendations-de2a4aacca3a
“Total construction capital costs are estimated to be $10,900,000.”
Scan 93Report recommendations-f910dde83cf1
“At both ramps the loss of a lane would change the level of service from A to B.”
Scan 108Report recommendations-0632f289b9a9
“Outbound LRVs would require a special fourth signal phase, which would be substituted for the Circular Avenue green phase.”
Scan 109Report recommendations-7090b6865b30
“On four-lane streets, Muni prefers to install 150-foot-long loading islands to accommodate two-car trains.”
Scan 109Report recommendations-ccd4db05a377
“Catch basins and inlets would require relocation along various portions of the three alignments.”
Scan 148Identifier ia:C124895686