Records › City reports › Muni J Line connection project, San Francisco, California (1982)

Cover of the report
City report · environmental impact report · 1982

Muni J Line connection project, San Francisco, California (1982)

Muni J Line connection project, San Francisco, California : draft environmental impact statement

A draft environmental impact statement by the U.S. Department of Transportation on routes for connecting the J-Church Muni line to Metro Center. Scan on the Internet Archive ↗

Cost
$17,400,000 construction capitalScan 93 ↗
Length
3.3 milesScan 7 ↗
Daily riders
1,500-1,800 additional ridersScan 123 ↗
Report recommendations
  • Muni proposes to connect the J-Church line terminal at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.Scan 6 ↗
  • The draft estimates the J Line would save 915 minutes per weekday in travel time under the Monterey Boulevard alignment.Scan 123 ↗
Findings
  • The document finds none of the alignments would affect designated landmarks, known archaeological sites, or National Register-eligible properties.Scan 34 ↗
14 quotes from the scan

Printed words Quoted from the page as read from the scan.

Report recommendations-63f97e858f2b

“Muni proposes to connect the present terminal of the J-Church streetcar line at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.”

Scan 6

Report recommendations-9c9448ccffe3

“Revenue service would provide a connection linking the Mission District with the southern portion of the City.”

Scan 6

Report recommendations-eb5b76cc9ded

“Muni also proposes operationally to interline the J and M lines to form a loop route.”

Scan 6

Findings-611990c008bf

“None of the alignments would affect any designated landmark or known archaeological site or properties on or eligible for the National Register at Historic Places.”

Scan 34

Findings-f2d78b35a4bc

“None of the proposals would displace or relocate businesses or residential structures.”

Scan 34

Findings-426b2d0738a8

“However, the power is delivered through the PG&E distribution system.”

Scan 49

Findings-7837dd9e2a9c

“The M line and BART have attracted so much patronage away from the 26X that it has been discontinued.”

Scan 64

Report recommendations-1d612e2b16e5

“If six-minute headways were maintained the entire length of the J line, an additional six vehicles would be needed (plus a spare).”

Scan 93

Report recommendations-de2a4aacca3a

“Total construction capital costs are estimated to be $10,900,000.”

Scan 93

Report recommendations-f910dde83cf1

“At both ramps the loss of a lane would change the level of service from A to B.”

Scan 108

Report recommendations-0632f289b9a9

“Outbound LRVs would require a special fourth signal phase, which would be substituted for the Circular Avenue green phase.”

Scan 109

Report recommendations-7090b6865b30

“On four-lane streets, Muni prefers to install 150-foot-long loading islands to accommodate two-car trains.”

Scan 109

Report recommendations-ccd4db05a377

“Catch basins and inlets would require relocation along various portions of the three alignments.”

Scan 148

Identifier ia:C124895686