5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies
A plan by the City and County of San Francisco's Municipal Railway on Muni Metro issues and strategies, covering rail sequencing, extensions and service startup. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-67532417e373
“It is likely that the case has been averstated, at least for cases (a) and (b).”
Scan 7
Scan 14Findings-479e449ea62c
“This proposal was also included in the February 1975 preliminary engineering study, and was found feasible.”
Scan 21Report recommendations-e4913e4ecfbe
“The design as sketched is a minimum cost alignment, based on single-level subway construction.”
Scan 21Report recommendations-19b1519d0c2f
“Such a facility could essentially eliminate the labor and operating costs associated with mid-day pull-ins and pull-outs.”
Scan 23Report recommendations-1a86099c24c9
“Operating cost offsets could be achieved by reductions in present surface bus operations such as the 40-COMMUTER and 80-GATEWAY EXPRESS.”
Scan 23Report recommendations-59ebe83ade67
“Extending the J-M trips to the SP Depot, however, would very conveniently allow terminal layovers to be taken there.”
Scan 23Report recommendations-7eadf81bca21
“The Concept G proposal would provide a physical connection, via the subway, between the Embarcadero rail line and the MUNI's principal rail vehicle maintenance and storage base at Balboa Park.”
Scan 23Report recommendations-0dcc07437506
“A stand-by schedule to respond to excess demand for service should also be prepared, based on 24 minute peak headways.”
Scan 25Report recommendations-909f1c01540c
“Work on engineering design and subsequent reconstruction of facilities at Embarcadero should be expedited so as to get underway at the earliest possible time.”
Scan 25Report recommendations-e7fb43a72c40
“N-JUDAH service will require staffing of the Embarcadero, Montgomery, Powell, Civic Center and Van Ness Stations, but not Church or Castro.”
Scan 25Report recommendations-8f449742eb38
“Inauguration of K and L MUNI METRO service will require staffing the Church and Castro Stations.”
Scan 28BackgroundPrinted words, misread in placess-ab42f3e26885
“From Junipero Serra Boulevard and St. Francis Circle, via West Portal Ave., 19th Avenue Extension, Worcester, Randolph, Orizaba and Broad Streets to Plymouth Avenue.”
Scan 33Report recommendations-e3260c2d4257
“For the longer run, the best, and probably only practical, operating solution is to build a loop as soon as possible at the downtown LRV terminal.”