5 year plan, 1977-1982

5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies

A plan by the City and County of San Francisco's Municipal Railway on Muni Metro issues and strategies, covering rail sequencing, extensions and service startup. Scan on the Internet Archive ↗

Cost
$10 millionScan 14 ↗
LRV fleet
approximately 25 LRVsScan 25 ↗
Capacity increase
over 50%Scan 25 ↗
Report recommendations
  • The paper proposes an N-K-L-M-J sequence to serve the three most important rail lines first.Scan 12 ↗
  • The plan proposes extending the J-CHURCH line from the 30th Street terminal to a connection with the existing system at Balboa Park Station/Metro Center.Scan 14 ↗
  • The report proposes expediting engineering design and reconstruction of Embarcadero Station facilities.Scan 25 ↗
Board decisions
  • Muni asked to narrow Metro platform gap under 4.5 inchesRecord · Journal page ↗
  • 1977 · This reportCity and County of San Francisco, Municipal Railway
  • Federal money approved to rebuild and repave Church Street, 22nd to 30thRecord · Journal page ↗
  • Salary ordinance adding 309 positions for the Muni Metro System passed on first reading.Record · Journal page ↗
  • Board passed an ordinance amending the Annual Salary Ordinance to classify 309 positions for the Muni Metro System.Record · Journal page ↗
  • Fifteen Municipal Railway positions for the Muni Metro Start Up Program were added to the salary ordinance, passed for second reading.Record · Journal page ↗
  • $2.8 million (≈ $11.4 million in 2026 dollars) for Muni Metro start-up approvedRecord · Journal page ↗
3 more Board decisions after the report
  • Fifteen Muni Metro positions classified for startup programRecord · Journal page ↗
  • Muni Metro startup money set at $2,835,438 (≈ $11.6 million in 2026 dollars); moves to final vote.Record · Journal page ↗
  • Approved spending $45,261 (≈ $185,076 in 2026 dollars) to investigate and repair various track switches in the Muni Metro system.Record · Journal page ↗
14 quotes from the scan

Printed words Quoted from the page as read from the scan.

Findings-67532417e373

“It is likely that the case has been averstated, at least for cases (a) and (b).”

Scan 7

Findings-3422f493990d

“This is however now a committed project and construction is pending.”

Scan 14

Findings-479e449ea62c

“This proposal was also included in the February 1975 preliminary engineering study, and was found feasible.”

Scan 21

Report recommendations-e4913e4ecfbe

“The design as sketched is a minimum cost alignment, based on single-level subway construction.”

Scan 21

Report recommendations-19b1519d0c2f

“Such a facility could essentially eliminate the labor and operating costs associated with mid-day pull-ins and pull-outs.”

Scan 23

Report recommendations-1a86099c24c9

“Operating cost offsets could be achieved by reductions in present surface bus operations such as the 40-COMMUTER and 80-GATEWAY EXPRESS.”

Scan 23

Report recommendations-59ebe83ade67

“Extending the J-M trips to the SP Depot, however, would very conveniently allow terminal layovers to be taken there.”

Scan 23

Report recommendations-7eadf81bca21

“The Concept G proposal would provide a physical connection, via the subway, between the Embarcadero rail line and the MUNI's principal rail vehicle maintenance and storage base at Balboa Park.”

Scan 23

Report recommendations-0dcc07437506

“A stand-by schedule to respond to excess demand for service should also be prepared, based on 24 minute peak headways.”

Scan 25

Report recommendations-909f1c01540c

“Work on engineering design and subsequent reconstruction of facilities at Embarcadero should be expedited so as to get underway at the earliest possible time.”

Scan 25

Report recommendations-e7fb43a72c40

“N-JUDAH service will require staffing of the Embarcadero, Montgomery, Powell, Civic Center and Van Ness Stations, but not Church or Castro.”

Scan 25

Report recommendations-8f449742eb38

“Inauguration of K and L MUNI METRO service will require staffing the Church and Castro Stations.”

Scan 28

BackgroundPrinted words, misread in placess-ab42f3e26885

“From Junipero Serra Boulevard and St. Francis Circle, via West Portal Ave., 19th Avenue Extension, Worcester, Randolph, Orizaba and Broad Streets to Plymouth Avenue.”

Scan 33

Report recommendations-e3260c2d4257

“For the longer run, the best, and probably only practical, operating solution is to build a loop as soon as possible at the downtown LRV terminal.”