“The first phase, which was completed in October 1992, involved an analysis of all water-dependent industries and their land-related needs.”
Scan 0Records › City reports › [Public information documents relating to Port of San Francisco… (1…
[Public information documents relating to Port of San Francisco waterfront plan project]
A plan by the Port of San Francisco for a 7.5 mile stretch of waterfront, covering water-dependent industries, cruise, container, fishing, excursion boat and recreational uses.The Board passed the ordinance transferring City-owned land under the Mission Bay Port Land Transfer Agreement in February 1992. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-7304d9dedb05
“The first phase, which was completed in October 1992, involved an analysis of all water-dependent industries and their land-related needs.”
Scan 0Board decision citedPrinted words, misread in placess-b18b98aadc50
“The creation of a Waterfront Plan is called for by the citizen initiative, Proposition H, approved by San Franciscans in November 1990”
Scan 4Findings-07f1bef4b2a9
“In light of the absence of refineries in San Francisco, the Port does not expect an increase in demand for liquid bulk facilities.”
Scan 28Report recommendations-7a45dc9194d5
“One alternative for use of the grain elevator that may be feasible is for storage of coffee beans.”
Scan 28
Scan 28Findings-e7934313aa61
“As discussed in the San Francisco Terminal Modernization EIR, the Port's liquid bulk operation could be displaced eventually when the South Container Terminal is fully developed.”
Scan 28Findings-3c1821b306e5
“Both bridges currently experience slow travel speeds and queuing for periods longer than one hour, and both are projected to experience deficiencies in capacity over the next 20 years.”
Scan 56Findings-c26d8a56261b
“The current ferry vessels serving the Bay are, on the average, in excess Of 15 years old.”
Scan 56Findings-0bf6e2bbc22e
“There is only one public launch, it is currently out of commission because of storm damage to the dock, and it is poorly designed and undersized.”
Scan 76Report recommendations-21632821bd5c
“Preferred locations include the northern waterfront, and near the boat clubs between Piers 50 and 64.”
Scan 76Findings-2f9d5d8ac5ec
“Currently, there are vacancies for larger boats at existing marinas, however, there is a substantial shortage of berths for smaller boats.”
Scan 76Report recommendations-a4e942fb6e23
“A launch ramp and dry storage for trailerable boats should be combined at one location on the waterfront.”
Scan 76Report recommendations-3a336c6f9287
“The Port should evaluate whether there is a market for such uses and investigate the possibility of recruiting historic vessels to the slips.”
Scan 123Report recommendations-0840b77cc66d
“The Port intends to negotiate a new lease agreement with both SECO and Southwest that will take into consideration both of these points.”
Scan 146Report recommendations-733f79918baa
“The Port is going to renegotiate the lease arrangements with both Southwest and SECO.”
Scan 146Findings-2bb44e320580
“Currently, the cruise industry in San Francisco is very seasonal, lasting from mid-May until mid-October.”
Scan 169Findings-5759c3a1db5f
“For example, Vancouver and Los Angeles captured over 85% of the west coast cruise market in 1989.”
Scan 169Findings-302dd1601eec
“Recent trends show improvement in the profitability of shipping lines in general which over time could lead to increased demand for land for marine terminal development.”
Scan 194Findings-463cf23089c4
“Due to competition for land and development pressure, the amount of industrially zoned land in San Francisco has decreased substantially.”
Scan 218Findings-810e8a316ce5
“The Seaport Plan estimates that more than one billion dollars will be required to achieve the additional marine terminal capacity called for in the Seaport Plan.”
Scan 218Findings-acfd1a6cff63
“However, funds to develop those sites are not yet available. These lands are reserved for direct container terminal uses.”
Scan 218Findings-c66e546e9ce4
“For example, the cost to demolish Pier 24, currently condemned, was estimated at $4 million while the cost of restoring it to a viable economic use was $6 million.”
Scan 251Report recommendations-84eb04d88510
“As the Port confronts increasing demand for space in the future it will be important to reserve appropriate facilities to ensure that critical Support Services can be accommodated as required.”
Scan 271Findings-ec393ca05e49
“Located on Pier 62 and Seawall Lots 337 and 349, H and H Ship Services provides clean-up, processing, and disposal of marine waste oils.”
Scan 271Report recommendations-1e7ca220a7b2
“During construction, the areas under and around the proposed Hyde Street Harbor berths would be dredged to a minimum of -20 feet MLLW, resulting in removal of about 20,000 cubic yards of material.”
Scan 293Findings-439f386a2a11
“A recent study prepared for the Port estimated that excursion boat operators employ nearly 200 people, with a payroll of over $4 million each year.”
Scan 327Findings-9721d3fad69e
“The excursion boat industry paid the Port nearly $1 million in fees or rent in 1991.”
Scan 327Identifier ia:C124908577