Laguna Honda Hospital institutional master plan (1994)

Laguna Honda Hospital institutional master plan

A 1994 plan by the City and County of San Francisco, Department of Public Health for Laguna Honda Hospital. Scan on the Internet Archive ↗

Area
62 acresScan 64 ↗
Cost
$344,400,000 (1992 dollars)Scan 198 ↗
Staff
1,578 FTEsScan 48 ↗
Patients on tube feeding
more than 150 patientsScan 6 ↗

“[name withheld]” stands for a name the release withholds (Privacy).

Report recommendations
  • The recommended alternative would make the Hospital seven stories tall without exceeding the top elevation of the remaining existing buildings.Scan 188 ↗
  • The plan proposes upgrading the existing one-way access at Woodside Drive to a second entry and exit with a signal.Scan 188 ↗
Findings
  • The Main Building contains a number of architectural deficiencies.Scan 106 ↗
Board decisions
  • Supervisor Migden asked the City Attorney to draft a law urging water recycling in the Laguna Honda Hospital master plan.Record · Journal page ↗
  • 1994 · This reportCity and County of San Francisco, Department of Public Health
  • Vote on $299 million (≈ $604.7 million in 2026 dollars) to replace Laguna Honda Hospital; first vote passed.Record · Journal page ↗
  • Up to $299M (≈ $604.7 million in 2026 dollars) to rebuild Laguna Honda nursing hospitalRecord · Journal page ↗
  • Up to $299,000,000 (≈ $533.3 million in 2026 dollars) in Laguna Honda hospital bonds recommendedRecord · Journal page ↗
  • Finance committee recommended a resolution authorizing sale of up to $230M (≈ $410.2 million in 2026 dollars) in Laguna Honda Hospital bonds.Record · Journal page ↗
  • Proposes borrowing up to $299 million (≈ $533.3 million in 2026 dollars) for Laguna Honda Hospital.Record · Journal page ↗
2 more Board decisions after the report
  • Resolution declares $502,515,000 (≈ $1.0 billion in 2026 dollars) in bonds necessary to replace Laguna Honda Hospital, and was adopted.Record · Journal page ↗
  • Proposed $437 million (≈ $883.8 million in 2026 dollars) plan to replace Laguna Honda HospitalRecord · Journal page ↗
27 quotes from the scan

Printed words Quoted from the page as read from the scan.

Findings-5d059ae19756

“It does not comply with even the minimum contemporary requirements for skilled nursing facilities.”

Scan 6

Findings-6dab6a66cbb5

“The 62 acre Campus is located high on a hill overlooking low density residential neighborhoods.”

Scan 6

Findings-80f7197d3420

“In addition, San Francisco, at present, has approximately twice as many people age 60 or older than the national average (20% vs. 11% nationally).”

Scan 6

Findings-8fefe5003a1b

“On average, more than 150 patients require daily nasogastric or gastrostomic tube feeding.”

Scan 6

Findings-a0e8044199e9

“The average age of patients is 67 for males and 77 for females.”

Scan 6

Findings-7ad527dc3858

“It is the largest municipally owned long term care institution in the nation.”

Scan 14

Findings-f0fec66b8038

“The report stressed the need to prepare a Comprehensive Facility Master Plan.”

Scan 14

Findings-0d0cbb07f6cf

“The Hospital’s sloping 62- acre site is adjacent to the City’s Youth Guidance Center, located southeast of the LHH campus.”

Scan 64

Backgrounds-9319a9e8b2cd

“The immediately surrounding residential areas are zoned RH-1(D) and RH-1.”

Scan 80

Backgrounds-c79ac984689a

“The Laguna Honda Hospital site, including the adjacent Youth Guidance Center, is located within a Public Use District, indicating that it is owned by a governmental agency and used for public purposes.”

Scan 80

Report recommendations-4099c3f8eb49

“The proposed access road at Woodside Drive will access the existing parking lot on the southeast edge of the site.”

Scan 98

Findings-39f1b616ecc4

“Clarendon Hall, because of the fairly recent remodel completed in 1978, does not have the architectural code deficiencies of the Main Building.”

Scan 106

Findings-45a1d52f1304

“The damage suffered by Clarendon Hall in the 1989 earthquake will require time and sizable investment to repair.”

Scan 106

Findings-b9c7ddefff9a

“As the site of the Adult Day Health Care Center, Clarendon Hall provides minimum accommodations for that program.”

Scan 106

Findings-0e8199db164a

“Clayton Environmental Consultants, Inc. found asbestos containing materials in all buildings at the Hospital except for the Greenhouse.”

Scan 108

Findings-20a9a61fddbe

“The Laundry Building, with its rusted structural steel joists due to the Laundry’s high internal humidity is the most questionable.”

Scan 108

Findings-26e97c2a0663

“In January of 1990 the City commissioned Clayton Environmental Consultants, Inc. to investigate asbestos containing materials at the Hospital.”

Scan 108

Findings-49948d871240

“Removal and replacement of asbestos containing materials was estimated at up to $4 million for construction only.”

Scan 108

Report recommendations-4b0c341c1222

“Consideration should be given to their reconstruction or replacement.”

Scan 108

Findings-5f3b18ac3e07

“All of the ancillary buildings are past their useful life and are continuing to be patched on "as funds become available" basis.”

Scan 108

Findings-cd0254f27b58

“Their preliminary cost estimates for abatement measures total up to $3 million for construction only.”

Scan 108

Report recommendations-652bf586152f

“The proposed location of the new Laundry Facility is at the eastern edge of the sloping site along the new service drive.”

Scan 188

Report recommendations-f888c9d71ed9

“The Hospital can therefore be seven stories tall while not exceeding the top elevation of the existing buildings which remain.”

Scan 188

Findings-059dda0be225

“Alternate A was determined in the evaluation process to be the least desirable of the three alternates.”

Scan 198

Report recommendations-b00ae85e6b7b

“The projected construction period was seven and [name withheld] years. Alternate B provides almost complete replacement of existing hospital facilities over four construction phases.”

Scan 198

Report recommendations-c052ea00e1bb

“The estimated construction cost for Alternate B in 1992 dollars was $344,400,000 and with escalation would have been $574,000,000.”

Scan 198