Findings-5d059ae19756
“It does not comply with even the minimum contemporary requirements for skilled nursing facilities.”
Scan 6Records › City reports › Laguna Honda Hospital institutional master plan (1994)
Laguna Honda Hospital institutional master plan
A 1994 plan by the City and County of San Francisco, Department of Public Health for Laguna Honda Hospital. Scan on the Internet Archive ↗
“[name withheld]” stands for a name the release withholds (Privacy).
Printed words Quoted from the page as read from the scan.
Findings-5d059ae19756
“It does not comply with even the minimum contemporary requirements for skilled nursing facilities.”
Scan 6Findings-6dab6a66cbb5
“The 62 acre Campus is located high on a hill overlooking low density residential neighborhoods.”
Scan 6Findings-80f7197d3420
“In addition, San Francisco, at present, has approximately twice as many people age 60 or older than the national average (20% vs. 11% nationally).”
Scan 6Findings-8fefe5003a1b
“On average, more than 150 patients require daily nasogastric or gastrostomic tube feeding.”
Scan 6
Scan 6Findings-7ad527dc3858
“It is the largest municipally owned long term care institution in the nation.”
Scan 14Findings-f0fec66b8038
“The report stressed the need to prepare a Comprehensive Facility Master Plan.”
Scan 14Findings-0d0cbb07f6cf
“The Hospital’s sloping 62- acre site is adjacent to the City’s Youth Guidance Center, located southeast of the LHH campus.”
Scan 64
Scan 80Backgrounds-c79ac984689a
“The Laguna Honda Hospital site, including the adjacent Youth Guidance Center, is located within a Public Use District, indicating that it is owned by a governmental agency and used for public purposes.”
Scan 80Report recommendations-4099c3f8eb49
“The proposed access road at Woodside Drive will access the existing parking lot on the southeast edge of the site.”
Scan 98
Scan 106Findings-39f1b616ecc4
“Clarendon Hall, because of the fairly recent remodel completed in 1978, does not have the architectural code deficiencies of the Main Building.”
Scan 106Findings-45a1d52f1304
“The damage suffered by Clarendon Hall in the 1989 earthquake will require time and sizable investment to repair.”
Scan 106Findings-b9c7ddefff9a
“As the site of the Adult Day Health Care Center, Clarendon Hall provides minimum accommodations for that program.”
Scan 106Findings-0e8199db164a
“Clayton Environmental Consultants, Inc. found asbestos containing materials in all buildings at the Hospital except for the Greenhouse.”
Scan 108Findings-20a9a61fddbe
“The Laundry Building, with its rusted structural steel joists due to the Laundry’s high internal humidity is the most questionable.”
Scan 108Findings-26e97c2a0663
“In January of 1990 the City commissioned Clayton Environmental Consultants, Inc. to investigate asbestos containing materials at the Hospital.”
Scan 108Findings-49948d871240
“Removal and replacement of asbestos containing materials was estimated at up to $4 million for construction only.”
Scan 108Report recommendations-4b0c341c1222
“Consideration should be given to their reconstruction or replacement.”
Scan 108Findings-5f3b18ac3e07
“All of the ancillary buildings are past their useful life and are continuing to be patched on "as funds become available" basis.”
Scan 108Findings-cd0254f27b58
“Their preliminary cost estimates for abatement measures total up to $3 million for construction only.”
Scan 108Report recommendations-652bf586152f
“The proposed location of the new Laundry Facility is at the eastern edge of the sloping site along the new service drive.”
Scan 188Report recommendations-f888c9d71ed9
“The Hospital can therefore be seven stories tall while not exceeding the top elevation of the existing buildings which remain.”
Scan 188Findings-059dda0be225
“Alternate A was determined in the evaluation process to be the least desirable of the three alternates.”
Scan 198Report recommendations-b00ae85e6b7b
“The projected construction period was seven and [name withheld] years. Alternate B provides almost complete replacement of existing hospital facilities over four construction phases.”
Scan 198Report recommendations-c052ea00e1bb
“The estimated construction cost for Alternate B in 1992 dollars was $344,400,000 and with escalation would have been $574,000,000.”
Scan 198Identifier ia:C124914333