City report · study · 1993

Transit terminal study (1993)

Transit terminal study

A study by the Planning Department comparing transit terminal alternatives, recommending a new terminal at Main/Beale over upgrading the existing Transbay Terminal.In February 2001 the Board adopted, as amended, a resolution to form a joint powers agency for a new Transbay Terminal transit facility. Scan on the Internet Archive ↗

Cost
$101 million for Alternative BScan 11 ↗
Passengers
more than 31,000 daily in 1992Scan 12 ↗
Bus operators
12 at the TerminalScan 12 ↗
Basic upgrade cost
about $36 millionScan 20 ↗
Report recommendations
  • The staff recommends Alternative B, which sites a new transit terminal at Main/Beale.Scan 11 ↗
  • The study says Alternative A, with a new terminal and land uses stacked above, may be a complicated project needing about thirty months.Scan 58 ↗
Findings
  • The current estimated cost for the basic upgrades to the Terminal is about 36 million dollars.Scan 20 ↗
Board decisions
  • Transbay Transit Terminal survey area at Beale and Market Streets adopted as amended for redevelopment study.Record · Journal page ↗
  • 1993 · This reportCity and County of San Francisco, Planning Department
  • Main and Beale Streets favoured for a new Transbay transit terminalRecord · Journal page ↗
  • Federal grant adopted for the Mission Street transit projectRecord · Journal page ↗
  • Board endorses the Main/Beale South design for a replacement Transbay terminal and urges the Mayor to pursue it; referred to committee.Record · Journal page ↗
  • Endorsement of a Main/Beale South design for a replacement Transbay transit terminal, urging the Mayor to complete planning.Record · Journal page ↗
  • Resolution to form a joint powers agency for a new Transbay Terminal transit facility was adopted, as amended.Record · Journal page ↗
2 more Board decisions after the report
  • Resolution to form a joint powers agency for a new Transbay Terminal transit facility was referred for adoption at the next meeting.Record · Journal page ↗
  • Resolution creates a joint powers agency to develop a new intermodal transit facility at the Transbay Terminal site.Record · Journal page ↗
24 quotes from the scan

Printed words Quoted from the page as read from the scan.

Report recommendations-1c16fb2ba9b9

“The estimated cost to implement Alternative A would be $79 million.”

Scan 11

Report recommendations-27a1655c9b65

“The estimated cost to implement Alternative B would be $101 million.”

Scan 11

Report recommendations-8d25a0ac7f0d

“The estimated cost to implement Alternative X would be $93 million.”

Scan 11

Findings-e0366f4eb01b

“Some land acquisition would be needed for either Alternative A or B.”

Scan 11

Backgrounds-6825f260ade4

“The Transbay Transit Terminal (Terminal) and its adjoining ramp system were completed in 1939 as part of the construction of the Bay Bridge.”

Scan 12

Findings-f276bc2bf31d

“Currently there are 12 commute, non-commute and tour bus operators using the Terminal building.”

Scan 12

Findings-305eae31452b

“The current estimated cost for the basic upgrades is about $36 million.”

Scan 20

Findings-528b9cd20361

“The OSA study released in 1992 concluded that the Terminal building needed substantial upgrades to meet current seismic and other fire/life/safety codes.”

Scan 20

Backgrounds-8ab1d1ce6515

“The Terminal Separator provided an elevated connection between I-80 and the Embarcadero Freeway prior to being damaged by the earthquake.”

Scan 20

Report recommendations-aab849c7c39b

“Based on projections in the Transit Needs Study, AC Transit would require forty bus berths on the third floor deck.”

Scan 26

Report recommendations-02cdef62feda

“Alternative X would foreclose the possibility of direct Caltrain or other rail service into the Terminal.”

Scan 29

Report recommendations-8029ce2aa981

“An extension of Caltrain and/or high speed rail could be accommodated in a separate underground rail station located underneath Howard Street and private property between Natoma and Howard Streets.”

Scan 29

Report recommendations-c4a6232e6be5

“Alternative X would basically retain the existing Terminal building facade and create additional space for buses by reconfiguring the existing bus deck.”

Scan 29

Report recommendations-2d6d5d0967a6

“Alternative A, with a new transit terminal and other land uses stacked above, may be a complicated construction project and would require approximately thirty months.”

Scan 58

Report recommendations-c5e2efcab349

“Alternative B is estimated to take twenty-six months to complete construction.”

Scan 58

Report recommendations-ed35cf8f43e1

“Alternative X, which would require major modifications to the existing Terminal, is estimated to take twenty-six months for construction.”

Scan 58

Report recommendations-ce3ab1f9967a

“This terminal will have a total of 7 bus platforms and 44 bus bays.”

Scan 72

Report recommendations-0f0ce96a03dd

“This terminal will have a total of 5 bus platforms and 40 bus bays.”

Scan 76

Report recommendations-d42570660105

“The new terminal will have twice as many bus bays as the existing terminal.”

Scan 81

Report recommendations-e0ad718b2fac

“Underground parking garage could be constructed on the southeast section of the block bounded by First, Howard, Second, and Mission Streets.”

Scan 81

Findings-dafef76e16bd

“Notes to Alternative B: We have not included any costs for historic preservation impacts.”

Scan 109

Findings-e99f6d07501a

“No costs are included for interim bus operations which would have to be relocated during construction.”

Scan 109