Findings-96a8982489b8
“As of December 31, 1994, approximately 97% of the funds from Proposition A had been expended.”
Scan 8Records › City reports › San Francisco Unified School District (1995)
San Francisco Unified School District : operational audit, school repair program : 1988 Proposition A, 1990 Proposition B : final report
A 1995 audit by the San Francisco Unified School District about Balboa High School.In January 2002 the Board rejected a resolution urging the District to honour its promise on Proposition A bond money. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-96a8982489b8
“As of December 31, 1994, approximately 97% of the funds from Proposition A had been expended.”
Scan 8Backgrounds-c2430dd1a9cf
“Proposition B, the 1990 bond measure for an additional $90 million targeted for earthquake repairs, seismic upgrades, fire and safety issues, as well as deferred maintenance.”
Scan 8Report recommendations-19b67858d2d5
“We also recommend that a summary report for the construction program be developed and issued monthly.”
Scan 14Findings-261a92c40d04
“We found that the District has the current practice of using a standard 10% contingency for each construction project.”
Scan 14Report recommendations-776801a8222c
“We recommend implementing the recently developed project management system developed by FP&C.”
Scan 14Report recommendations-c4d35c2644c5
“We recommend that the flow chart be expanded to include an accompanying Project Procedure which details each step along the chart.”
Scan 14Report recommendations-fb90534b58f2
“However, we also recommend that the contingency be varied depending on the type, size, and complexity of the project.”
Scan 14Report recommendations-1eead436cdd9
“We recommend that the Inspectors report to the Design Department within FP&C, not the project management group.”
Scan 20Findings-cba432240265
“The architect of record did not always visit the site on a weekly basis and relied heavily on the inspectors.”
Scan 20Backgrounds-475742f3db78
“Proposition A was designed to fund basic repairs such as outdated and deteriorated restrooms, windows, roofs, walls, heating systems, and electrical wiring.”
Scan 24Findings-6a8dcc70ca14
“The average age of the 142 operating schools and child care centers in the San Francisco Unified School District (SFUSD) is 45 years, with 10 schools over 65 years old.”
Scan 24Findings-8c528fe90c6f
“Almost immediately, it became apparent that a twelfth work category, fire and life safety improvements, was required.”
Scan 24Findings-b029fe3a0c53
“In 1988, a study showed that over $450 million would be required to modernize these facilities.”
Scan 24Backgrounds-f5b1d974bf3b
“The voters in San Francisco responded by approving Proposition A in 1988, a $90 million bond issue to fund the most urgent school repairs at 128 schools.”
Scan 24Backgrounds-f5faa421ef49
“This was followed by Proposition B, an additional $90 million bond issue that was passed in 1990 and provided money for earthquake repairs.”
Scan 24Findings-3390f6b1cee1
“Through December 31, 1994, $98.4 million had been spent leaving a balance of $3.1 million.”
Scan 28Findings-98e94eca8264
“The original $90 million proceeds from Proposition A (bond principal) grew to approximately $101.5 million including interest received on the invested fund principal from July, 1988 to December, 1994.”
Scan 28Report recommendations-6ea45f2a99ae
“We recommend that the District continue to use contingencies when budgeting for and managing design and construction projects.”
Scan 50Report recommendations-81a898d17284
“We believe that a significant enough amount of time and money is involved here to warrant further investigation into getting the requirement reviewed and possibly amended.”
Scan 60Report recommendations-2f1f5d5c14cf
“We believe that the model school concept should be tried again, this time with input from the CAC and other school districts.”
Scan 62Findings-76aeec3bbe81
“The concerns focused on how to improve its involvement and increase its effectiveness.”
Scan 62Report recommendations-787bf0536039
“We recommend that the role of the CAC be reviewed and redefined if necessary so that the Committee has a renewed sense of their role.”
Scan 62Report recommendations-319c0ffd02c5
“We recommend that the change order approval process be held to strict time deadlines so that the contractors do not have to work without formal review or approval.”
Scan 72Findings-d255909d0256
“The forms ranged from a AIA form to a handwritten request on the contractor's letterhead.”
Scan 72Report recommendations-182a5d028642
“We recommend that liquidated damage provisions in contracts be enforced, or at least used in negotiations with contractors who are late in completing their work.”
Scan 76Report recommendations-ac236fce93b0
“We recommend a review by the District to ensure that certified payrolls are submitted and that prevailing wages are being paid.”
Scan 76
Scan 76Findings-a66e4e86216a
“There is confusion regarding the role, responsibility, and reporting lines for the Inspectors.”
Scan 78Findings-421ba9fe9d3b
“We noted that the design process was led by a structural engineer, not an architect as is customary, due to seismic considerations.”
Scan 94Findings-6a0744a18878
“It was not possible to segregate the specific funds associated with Proposition A for the construction program since they were intermingled with funds from other programs.”
Scan 94Findings-ae8e8c450a1a
“There were 12 contract modifications, which resulted in a final cost of approximately $5.0 million.”
Scan 94Findings-d71db1b6b0ae
“The improvements funded by Proposition A have improved the school, especially the new heating system with its associated Energy Management System.”
Scan 94Findings-32eb499cf0c5
“This caused the originally planned construction to be delayed resulting in only $1.4 million in construction actually being performed under 1988 Proposition A.”
Scan 98Findings-8d18a47c1305
“The window sash replacement contract with Kimel was originally bid at $205,920 and completed at $260,000.”
Scan 98Findings-a494c1d91e5c
“The counseling office rehab contract with Trenery was originally bid at $127,800 and completed at $150,000.”
Scan 98Identifier ia:C124917982