What city reports said about Hetch Hetchy / O'Shaughnessy Dam
8 statements from 3 reports, oldest report first.
The page of Hetch Hetchy / O'Shaughnessy Dam · All places in the reports
Matched to this place by name. Quoted from the report. Sorted by a model.
San Francisco water & power : a history of the Municipal Water Department and Hetch Hetchy System 1985
San Francisco Public Utilities Commission
Board decision citedResolution No. 6949 scan 2
Board of Supervisors adopts resolution #6949 formally abandoning the Hetch Hetchy development
FindingAt its dedication on July 7, 1923, it was acclaimed the largest single structure of the West Coast. scan 37
At its dedication on July 7, 1923, it was acclaimed the largest single structure of the West Coast.
FindingThe cost was met solely by the City — without State or Federal assistance. scan 37
The cost was met solely by the City — without State or Federal assistance.
FindingTransbay Construction Company made the low bid of $3,219,965 and construction started in January 1935. scan 46
Transbay Construction Company made the low bid of $3,219,965 and construction started in January 1935.
BackgroundSan Francisco had approved a $3.5 million bond issue for this project in November 1933. scan 46
San Francisco had approved a $3.5 million bond issue for this project in November 1933.
Crytosporidium white paper 1996
City and County of San Francisco, Public Utilities Commission
FindingThe required ozone dose for inactivating Cryptosporidium in Hetch Hetchy has been determined to require a much longer reaction time than is conventionally used for ozonation. scan 20
The required ozone dose for inactivating Cryptosporidium in Hetch Hetchy has been determined to require a much longer reaction time than is conventionally used for ozonation.
FindingUsing proposed Method 9711B, Cryptosporidium levels detected ranged from less than 0.1 to 0.8 oocysts per 100 liters in Hetch Hetchy water. scan 20
Using proposed Method 9711B, Cryptosporidium levels detected ranged from less than 0.1 to 0.8 oocysts per 100 liters in Hetch Hetchy water.
Final report on the feasibility of electric system municipalization in San Francisco 1997
City and County of San Francisco, Public Utilities Commission
FindingDuring the runoff season, April through July, electric generation is at is maximum capacity, approximately 400 MW. scan 186
During the runoff season, April through July, electric generation is at is maximum capacity, approximately 400 MW.