What city reports said about The Embarcadero
11 statements from 10 reports, oldest report first.
The page of The Embarcadero · All places in the reports
Matched to this place by name. Quoted from the report. Sorted by a model.
“[name withheld]” stands for a name the release withholds (Privacy).
Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan 1958
San Francisco Redevelopment Agency
Report recommendationThe dominant feature of the Plan is the large open central mall running east-west from the Embarcadero to Battery Street, which effectively separates the residential and commercial areas. scan 26
The dominant feature of the Plan is the large open central mall running east- west from the Embarcadero to Battery Street, which effectively separates the residential and commercial areas.
Establishment of Mayor's Office of Economic Development in San Francisco : first year final report 1974
City and County of San Francisco, Mayor's Office of Economic Development
FindingSeveral properties in the Mission District and in the Embarcadero area have already been renovated for a variety of industrial, educational, and commercial uses. scan 23
Several properties in the Mission District and in the Embarcadero area have already been renovated for a variety of industrial, educational, and commercial uses.
The plan for the northeastern waterfront : a part of the Master plan of the City and County of San Francisco and a revision of the existing Northern waterfront plan : a proposal for citizen review 1976
City and County of San Francisco, Department of City Planning
Report recommendationImportant Bay views along The Embarcadero and level inland streets are preserved and improved. scan 20
Important Bay views along The Embarcadero and level inland streets are preserved and improved.
Short-term improvements in transit access to Southern Pacific passenger services in San Francisco 1976
San Francisco Municipal Railway
FindingAs this area has seen a heavy concentration of recent office construction, Route 32 has developed a strong commuter character. scan 18
As this area has seen a heavy concentration of recent office construction, Route 32 has developed a strong com- muter character.
5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies 1977
City and County of San Francisco, Municipal Railway
FindingThis proposal was also included in the February 1975 preliminary engineering study, and was found feasible. scan 21
This proposal was also included in the February 1975 preliminary engineering study, and was found feasible.
Report recommendationThe design as sketched is a minimum cost alignment, based on single-level subway construction. scan 21
The design as sketched is a minimum cost alignment, based on single-level subway construction.
Fisherman's Wharf action plan 1981
Port of San Francisco
Report recommendationA ceremonial entry feature is to be built at the easternmost end of the plaza where The Embarcadero meets Jefferson Street. scan 38
A ceremonial entry feature is to be built at the easternmost end of the plaza where The Embarcadero meets Jefferson Street.
Getting things done : visions & goals for San Francisco : a two-year progress report 1990
Agnos, Art (Mayor of San Francisco)
FindingThe Embarcadero Transit Project has hired artist [name withheld] to assist in the development of the Master Plan with Bechtel Corporation. scan 47
The Embarcadero Transit Project has hired artist [name withheld] to assist in the development of the Master Plan with Bechtel Corporation.
Draft waterfront land use plan 1994
City and County of San Francisco, Waterfront Plan Advisory Board
FindingWhile this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects. scan 30
While this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects.
Port of San Francisco : draft waterfront land use plan 1994
City and County of San Francisco, Waterfront Plan Advisory Board
BackgroundWhile this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects. scan 28
While this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects.
The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan 1997
Port of San Francisco
Report recommendationRecognize the terminus of The Embarcadero at Pier 45 with a sculpture or other public access feature. scan 66
Recognize the terminus of The Embarcadero at Pier 45 with a sculpture or other public access feature.