- Board proposes $5,000 from the General Fund to the California Toll Bridge Authority for surveying the transbay bridge.
- $5,000 to the California Toll Bridge Authority for transbay bridge plans linked by the name only, not checked
- Art Commission asks that the Bay Bridge ramp be moved linked by the name only, not checked
- Art Commission asks that the Bay Bridge ramp be moved linked by the name only, not checked
- The city agreed to surrender $390,000 in bonds so the state toll bridge authority would move the Transbay Bridge's western terminus. linked by the name only, not checked
- Resolution directs the Controller and Treasurer to deliver $100,000 of Toll Bridge Authority bonds to the state authority.
- Supervisor Uhl proposed asking the California Toll Bridge Authority not to grant exclusive Bay Bridge franchises beyond ten years. linked by the name only, not checked
- $95,000 of bridge bonds handed to the California Toll Bridge Authority
- Resolution 2991 would have the Controller and Treasurer deliver $95,000 worth of bonds to the California Toll Bridge; the outcome is not yet shown.
- $100,000 in bridge bonds handed to the California Toll Bridge Authority
- Agreement with California Toll Bridge Authority to paint the city's pipe line on the Bay Bridge is proposed. linked by the name only, not checked
- The Public Utilities Commission would contract with the California Toll Bridge Authority to paint the city's pipe line on the Bay Bridge.
- Proposal for the Toll Bridge Authority to paint the water pipe line while repainting the bridge, with the city paying about $400 yearly; vote not printed.
- Action on the $37,500 request to fund a second bay bridge study was postponed until the matter comes before the Board officially.
- Parking lots approved under the Bay Bridge approach downtown
- Parking lots approved under the Bay Bridge approach downtown
- Standard Oil allowed to pave Charlestown Place as a parking lot
- Board resumes debate on San Francisco's position on a proposed Toll Bridge Authority crossing from Army Street to Bay Farm Island.
- The Board adopted, as amended, a resolution assenting to a changed location for the southern San Francisco Bay crossing.
- Hearing requested on concurring with temporary closure of two lower-deck lanes of the Bay Bridge on a Sunday in October; outcome continues. linked by the name only, not checked