existing Terminal
Named in the records1993–2010
26 records of San Francisco tie this place, 1993–2010: 0 decisions of the Board of Supervisors and 26 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 26: 0 Board decisions, 26 facts from city reports
- Years
- 1993–2010
What the records say
All 26 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1993 | Second bus deck over existing Terminal · finding: second deck could be built but ramp splits and surface street connection would be difficult; option not developed | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: A total of 78 spaces can be accommodated off-street, including 9 MUNI/SamTrans spaces; 82 platforms needed; four spaces on street | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Caltrain extension station at Transbay Terminal · proposes: use existing ramps and Terminal platform for a Caltrain station | project | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - Existing Terminal Site · other: Transit Terminal Street Level Plan, Figure 10 | measure | City report: Transit terminal study scanned page ↗ |
| 1993 | Transit terminal street level · other: Total street level bus count 38 | measure | City report: Transit terminal study scanned page ↗ |
| 1993 | AC Transit terminal · other: 39,000 sq ft | building | City report: Transit terminal study scanned page ↗ |
| 1993 | Existing Transbay Terminal seismic and safety compliance · cost usd: approximately $30 million in regional bridge tolls | project | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative X (modifications to existing Terminal) · other: twenty-six months for construction | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Transit terminal reconstruction · other: expansion of existing terminal building envelope | project | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A transit terminal, existing terminal site · alternative: Alternative A-Existing Terminal Site, Transit Terminal Below Ground Level Plan | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative X · cost usd: $93 million | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative X · proposes: modifies the existing Terminal | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - New terminal at existing terminal site · alternative: New regional transit terminal primarily underneath potential land uses in blocks bounded by Mission, Beale, Natoma, First Streets | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - New terminal at existing terminal site · other: Six bus platforms and twenty-two bus berths | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - New terminal at existing terminal site · alternative: On Grade and Underground | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · alternative: Alternative A - New Terminal at Existing Terminal Site | project | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative 1 - Expand the Existing Terminal Building To Mission Street · alternative: Expand the existing Transbay Terminal Building to Mission Street for long-haul bus services | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: Total clearance need is at least 28 feet; elevation difference between bus deck and street level is only 20 feet | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - Existing Terminal Site · alternative: Existing terminal site, transit terminal street level plan | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - Existing Terminal Site · other: Total street level bus count: 38 | measure | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - Existing Terminal Site · other: Golden Gate Transit bus count: 13 | measure | City report: Transit terminal study scanned page ↗ |
| 1993 | Alternative A - Existing Terminal Site · floor area sqft: 39,000 S.F. | measure | City report: Transit terminal study scanned page ↗ |
| 1995 | Transbay Transit Terminal · finding: Findings for the existing Terminal site are less relevant to the Transbay Area Plan | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 2010 | Port of San Francisco existing container terminals · finding: Port can accommodate the 2010 growth forecast at existing terminal sites, including reserved areas | finding | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1995 | CalTrain existing terminal · other: existing terminal at Fourth and Townsend | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Alternative X (modified existing Terminal) · other: earliest completion in second half of 1997 | alternative | City report: Transit terminal study scanned page ↗ |