129 records of San Francisco tie this place, 1861–2035: 14 decisions of the Board of Supervisors and 115 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
129: 14 Board decisions, 115 facts from city reports
Years
1861–2035

What the records say

The 60 most telling of its 129 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1861Francisco Reservoir · built: ConstructedbuildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1861Francisco Reservoir · built: 2.5 million gallon reservoir constructedbuildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1861Francisco Reservoir · built year: 1861siteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1985Francisco Reservoir · other: Reservoir on north slope of Russian Hill, elevation 135 feet, still in usebuildingCity report: San Francisco water & power : a history of the Municipal Water Department and Hetch Hetchy System
scanned page ↗
1990Francisco Reservoir · other: Formerly supplied a portion of the University Mound service areasiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990University Mound pressure zone - Use of existing Francisco Reservoir · alternative: Re-connection of existing 135-foot Francisco Reservoir offers minimal pressure benefitalternativeCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir enlarged and raised · alternative: Raise Francisco Reservoir to overflow elevation of 172 feet to float on University Mound systemalternativeCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir system check valve · other: Check valve installed to prevent back-flow towards University MoundmeasureCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Connection line to Francisco Reservoir · other: 800 feet of 24-inch pipe connecting University Mound zone to Francisco ReservoirmeasureCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Check valves installed to allow gravity refilling from University Mound zone during low demand periodsactionCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Area previously served by Francisco Reservoir is now part of the University Mound pressure zonesiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: Fire Chief Blackburn would like to have Francisco Reservoir renovated to provide emergency fire supply for the Marina DistrictrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · alternative: if plumbed to serve the Marina alone, Francisco Reservoir provides 2.1 days storage in addition to University Mound's 3.3 daysalternativeCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: Marina District, formerly served by Francisco Reservoir, is now part of the University Mound pressure zonefindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Integration into University Mound System would reduce demand on University Mound by 2.2 mgdfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Invaluable fire reserve facility per SFFD; remote from supply source, adjacent to Marina and North Beach DistrictsfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: renovation would provide this storagerecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: 2.5-million-gallon single brick-lined basin, located on Russian HillbuildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: located in the northeast corner of San Francisco on the north slope of Russian HillsiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: underlain by shale and sandstone of the Franciscan Complex; bedrock should be mostly shale with some sandstone at the southeast cornersiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Franciscan may be mantled with 5 to 10 feet of slope debris; elevation 125 bench cut into bedrock except along north berm toesiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: capacity approximately 2.5 million gallonsbuildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: 410 feet long by 120 feet wide by 8 feet deepbuildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: brick lining in some areas is deterioratingfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: many older redwood posts show deterioration near the bottom and at the water line levelfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: roofing is aging and shows great signs of wear; boards cracked and loosefindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: reservoir is not in use at the present timefindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: must be repaired before being returned to the City's distribution systemrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: available data not adequate for evaluating static and seismic stability of embankment and foundationfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: site-specific geotechnical study should be performed, including seismic stability evaluation of existing slopesrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: bottom of the reservoir removed and replaced with a concrete slabsiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: returned to service after remedial stepsrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: water level must be raised to between Elevation 145 and 150findingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: height of the berms raised ten to fifteen feet and brick lining replacedrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · recommendation: entire deck, roofing, columns, and foundation replaced with structural system like Balboa Reservoir South BasinrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · cost usd: 4,280,433measureCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · cost usd: 558,317 contingencies (15%)measureCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · floor area sqft: 49,200 S.F.buildingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: overflow elevation of 135 feetsiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: can serve most of the Marina and North Beach DistrictsfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: service area could include most of the Financial District, to as high as Kearney StreetfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · alternative: raising reservoir up to an additional 40 feet to elevation 175 feet would marginally expand service areaalternativeCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: 2.5 MG reservoir on Russian Hill with overflow elevation of 135 feetsiteCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir low pressure area · finding: low pressure area located just below the Francisco ReservoirfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · finding: reservoir volume must meet full duration of high demand to prevent drainingrecommendationCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir service area · finding: Inadequate pressures in the Marina and North Beach Districts under present system characteristicsfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Dedicated Francisco Reservoir pressure zone · alternative: Creation of dedicated Francisco Reservoir pressure zone with a raised reservoiralternativeCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · other: Water surface stabilizes at about 145 feet; draws down to about 138 feet at lowest levelfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir expanded floor area · other: With floor area expanded about 45 feet toward toe of hill, drawdown only to about 140 feetfindingCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
2008Board adopts policy urging the Public Utilities Commission to keep Francisco Reservoir as public recreation and open space.passedBoard decision
scanned page ↗
2008Proposed resolution urges the Public Utilities Commission to keep Francisco Reservoir as public recreation and open space; sent to committee.referredBoard decision
scanned page ↗
2008-12-16Policy adopted urging the Public Utilities Commission to keep Francisco Reservoir as public recreation and open space.passedBoard decision
scanned page ↗
2010-04-27Ten-year city building plan adopted; city to explore keeping Francisco Reservoir open.passedBoard decision
scanned page ↗
2010-04-27Ten-year city building plan adopted; city to explore keeping Francisco Reservoir open.passedBoard decision
scanned page ↗
2014-07-22Francisco Reservoir land moves to park department for $9.9M (≈ $14.1 million in 2026 dollars)passedBoard decision
scanned page ↗
2014-07-22Francisco Reservoir land moves to park department for $9.9M (≈ $14.1 million in 2026 dollars).passedBoard decision
scanned page ↗
2014-11-04Farrell proposes transferring Francisco Reservoir from SFPUC to Recreation and Park for $9,900,000 (≈ $14.1 million in 2026 dollars); sent to Land Use Committee.referredBoard decision
scanned page ↗
2016-07-19$25 million (≈ $35.1 million in 2026 dollars) gift accepted for new Francisco Reservoir parkpassedBoard decision
scanned page ↗
1990Francisco Reservoir · other: disconnected from University Mound systemeventCity report: Final report Balboa and Francisco Reservoirs needs assessment
scanned page ↗
1990Francisco Reservoir · event: disconnected from University Mound pressure zone systemeventCity report: Final report Balboa and Francisco Reservoirs needs assessment