192 records of San Francisco tie this place, 1961–2010: 3 decisions of the Board of Supervisors and 189 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
192: 3 Board decisions, 189 facts from city reports
Years
1961–2010

What the records say

The 60 most telling of its 192 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1961Golden Gate Bridge Toll Plaza modernization plan · proposes: conversion of the existing plaza into 12 northbound toll lanesalternativeCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1961Golden Gate Bridge Toll Plaza modernization plan · proposes: new 12-lane southbound toll collection plaza west of the administration buildingalternativeCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1968Golden Gate Bridge toll plaza · other: thirteen lanes through the plaza after toll lane changesmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1970Golden Gate Bridge Toll Plaza · other: traffic forecast of 10,500,000 vehicles by 1970findingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1970Golden Gate Bridge Toll Plaza · other: nearly 33 million vehicles crossed the bridgefindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1971-02-01Board backs Golden Gate Bridge toll plaza upgrade.passedBoard decision
scanned page ↗
1971-03-08Board endorses Golden Gate Bridge toll plaza upgradepassedBoard decision
scanned page ↗
1978Golden Gate Bridge Toll Plaza · other: traffic passed the 36 million markfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1981Golden Gate Bridge toll plaza masterplan study · other: Masterplan study authorized by Board Resolution 81-326projectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1981Golden Gate Bridge toll plaza · other: mixed toll of $1.00 Sunday through Thursday and $2.00 Fridays and SaturdayseventCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Existing administration building and toll plaza, Golden Gate Bridge · demolished: to be removedbuildingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · proposes: construction of entirely new toll booths and modernization of the toll registry systemprojectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza new roadway · finding: new roadway must be constructed for a four-lane width to accommodate morning southbound commute trafficfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Demolition, Excavation & Backfilling · cost usd: $816,000measureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · built year: plaza is nearly 50 years oldbuildingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Toll office building/emergency services · cost usd: $1,360,000buildingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Administration building · cost usd: $3,600,000buildingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: Toll plaza plot plan shown on this figuresiteCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: Capacity has long been of concern to the District for present and future traffic needsfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza new plaza scheme · cost usd: 14.3 Million DollarsprojectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982New Administration Building · other: new administration complex with enlarged parking, uphill from present employee parking lotbuildingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Proposed plaza scheme · finding: No significant impact on the environmentfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge Toll Plaza · other: 14 toll lanes, seven in each direction, two-way collectionsiteCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza toll lane · other: More than 600 vehicles per hour can be handled by one toll lane during morning commute periodmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: gross under-utilization of available toll lanes primarily caused by tight-radius curve and insufficient approach lengthfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza outside toll lanes 8, 10, 11, 13 · finding: two toll lanes on either side of the plaza (lanes 13, 11, 10 and 8) are considerably under-utilizedfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza lanes 11 and 13 · finding: tight merge conditions and narrow lanes for trucks and buses contribute to under-utilizationfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza lanes 8 and 10 · finding: short length of diverge and tight merge conditions cause under-utilizationfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: toll lane capacity rarely exceeds 400 vehicles per hourfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: Friday evenings only a maximum of seven toll lanes available for southbound traffic; Sunday evenings ten or eleven lanes availablefindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: northbound traffic restricted to a single sharply curved lane through the plaza into the bridgefindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: northbound volume exceeds single-lane capacityfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: northbound traffic must navigate narrow lanes between toll booths during normal hours, evenings and weekendsfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: curved approach and merger conditions beyond booths provide unsatisfactory traffic conditionsfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge · other: Rated capacity of each lane 1800 vehicles per hourfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge · other: Rated capacity 7200 vehicles per hour for four-lane commute period configurationfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: Major deficiency is the geometric layout, which was never designed for today's traffic speed and volumefindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: Rated capacity of four-lane morning commute configurationmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: Toll lanes required at 600 vehicles per hour per boothmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: Vehicles handled per toll lane per hour at $1.25 tollmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: Toll lanes required at this toll structure to accommodate rated capacitymeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · recommendation: Desirable optimum of 14 toll lanes to allow for uneven distribution and delaysrecommendationCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · recommendation: At least one toll lane reserved for buses and other toll-exempt traffic at all timesrecommendationCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · proposes: reverse toll collection from southbound to northboundmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: 6 northbound toll lanes during morning commutealternativeCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: 8 lanes through plaza for southbound four-lane trafficalternativeCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · other: twelve toll lanes for northbound traffic during evening commutealternativeCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · finding: Merge conditions for northbound evening commute traffic from the toll plaza uphill into the bridge are extremely unfavorable and will reduce normal toll lane capacity considerablyfindingCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza · recommendation: Provide toll taker access across active southbound lanes by a fully enclosed overhead walkway or an underground tunnelrecommendationCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza booths · other: Toll booths for lanes 11 and 13 will be rebuilt and relocated to the east side of the plazameasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Northbound toll collection, Golden Gate Bridge toll plaza · cost usd: approximately $1,350,000measureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Toll plaza bypass roadway · other: four-lane new roadway by-passing the toll plazameasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Toll plaza bypass roadway · other: approximately 2,650 feet total lengthmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge southbound by-pass scheme · cost usd: $15,000,000projectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll lanes and toll booths rebuilding · cost usd: another $3,000,000projectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza widening · proposes: Relocation and widening of the present plaza westward into the area occupied by the Administration BuildingprojectCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza widening · other: 12 lanes for southbound toll collectionmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza widening · other: four unobstructed lanes for northbound trafficmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1982Golden Gate Bridge toll plaza bus stops · other: New bus stops in separated traffic lanes in both traffic directionsmeasureCity report: Golden Gate Bridge toll plaza masterplan study
scanned page ↗
1981Golden Gate Bridge toll plaza · other: $1.25 toll instituted, then abandoned due to serious traffic delayseventCity report: Golden Gate Bridge toll plaza masterplan study