Qipudata
San Francisco · v0.7.1
qipu data›San Francisco›Places›Hunters Point and Potrero generating stations

Hunters Point and Potrero generating stations

Named in the records1996–1997

8 records of San Francisco tie this place, 1996–1997: 0 decisions of the Board of Supervisors and 8 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
8: 0 Board decisions, 8 facts from city reports
Years
1996–1997

What the records say

All 8 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1996SF reliability units (Hunters Point and Potrero generating stations) · cost usd: about $10-million per year in 1996 dollarsfindingCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · other: assumed not acquired or operated by a SF municipal electric utilityfindingCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · finding: San Francisco municipal electric utility will not be required to purchase the stations from PG&E; excluded from acquisition cost analysisfindingCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · other: municipal utility will not have to acquire these SF generating stations; no capital costs includedfindingCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · other: Will continue to be dispatched to provide reliability to SF until an alternative source is constructed, whether or not the distribution system is municipalizedsiteCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · other: used to supply part of the local San Francisco loadsiteCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997Hunters Point and Potrero generating stations · other: two aged and two relatively efficient gas/oil fired steam units and four quick-start combustion turbinessiteCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗
1997SF reliability units (Hunters Point and Potrero generating stations) · other: SF reliability costs spread over all of PG&E's service territory in the CEC consultant's forecastfindingCity report: Final report on the feasibility of electric system municipalization in San Francisco
scanned page ↗

All 8 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0