new transit terminal

Named in the records1972–1996

66 records of San Francisco tie this place, 1972–1996: 2 decisions of the Board of Supervisors and 64 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
66: 2 Board decisions, 64 facts from city reports
Years
1972–1996

What the records say

The 60 most telling of its 66 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1972-06-26City backs new transit terminal at Transbay sitepassedBoard decision
scanned page ↗
1972-06-26City backs new transit terminal at Transbay site.passedBoard decision
scanned page ↗
1993New Transit Terminal, Alternative A · cost usd: Ramp demolition, construction contingency and related costs (+50%) 4,455,500measureCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · acquired: Two small parcels of privately owned property north of Howard Street and one triangular-shaped private parcel mid-block on Main between Howard and Folsom Streets would be requiredalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal at Main/Beale Site · finding: improves accessibility and connectivity to BART and MUNI Metro at Embarcadero StationalternativeCity report: Transit terminal study
scanned page ↗
1993New transit terminal alternatives · other: easy access to existing transit services on Market and Mission StreetsalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal · alternative: Alternative BalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative B, Main/Beale Site · alternative: Alternative B, New Transit Terminal, Main/Beale Site, mezzanine level planalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Main/Beale Site, mezzanine level · other: Ramp to Bay Bridge and to Folsom St. from the mezzanine levelsiteCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · cost usd: Total direct construction cost 61,068,710measureCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: No costs included for basement ventilation system for bus exhaustfindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: No costs included for historic preservation impactsfindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: Potential rail station not assumed to be developed as part of projectfindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: Scheme does not include a podium or any development abovefindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: Retail spaces are core and shell; tenant improvements paid by tenantfindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · other: Major utility relocation not included since scope is not knownfindingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative A · cost usd: Estimate based on today's construction cost with no escalationfindingCity report: Transit terminal study
scanned page ↗
1993Alternative A New Transit Terminal · alternative: Existing site, below ground level plan (Figure 11)measureCity report: Transit terminal study
scanned page ↗
1993Alternative A - New Transit Terminal · alternative: Private Land AcquisitionalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative A - New Transit Terminal · alternative: two-way, shorter ramp for bus access would eliminate existing ramp structure north of Folsom Street between Essex and Beale StreetsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal · alternative: New transit terminal at Main/Beale site, on grade and second level (Figure 16)alternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Alternative B · alternative: Main/Beale Site, upper level planalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Alternative B · other: Bus count ACT & Gray Line tours, total top level 40measureCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · cost usd: an estimated $101 million for a new transit terminalalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: single level stub-end terminal with eight tracks, six reserved for Caltrain extension and two for high speed railalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: 1000-1400 feet train platform to accommodate 10-car train operationalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: eliminates the portion of the existing ramp structure located north of Folsom Street between Essex and First StreetsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: excellent pedestrian access provided by transit plaza at Mission and Beale StreetsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: forecloses reconstruction of the Main and Beale Street freeway ramps but preserves options for an elevated freeway ramp to the waterfrontalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal · other: Alternative B would maximize land use development opportunities on the existing Transbay Transit Terminal sitealternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B New Transit Terminal, Main/Beale Site · alternative: Alternative B, New Transit Terminal, Main/Beale Site, UndergroundalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal · alternative: Alternative B new transit terminal at Main/Beale sitealternativeCity report: Transit terminal study
scanned page ↗
1993Combined EIR/EIS schedule for new transit terminal (Alternatives A and B) · other: 37-40 months total elapsed timefindingCity report: Transit terminal study
scanned page ↗
1993Separate EIR schedule for new transit terminal (Alternatives A or B) · other: TOTAL ELAPSED TIME 29-31 monthsprojectCity report: Transit terminal study
scanned page ↗
1993Alternative A new transit terminal · cost usd: $79 millionalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B new transit terminal at Main/Beale · cost usd: $101 millionalternativeCity report: Transit terminal study
scanned page ↗
1993new transit terminal · other: at least ten months for construction drawingsprojectCity report: Transit terminal study
scanned page ↗
1993City approvals for new transit terminal · other: six months beyond completion of environmental processprojectCity report: Transit terminal study
scanned page ↗
1993Alternative A (new transit terminal with land uses stacked above) · other: approximately thirty months for constructionalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B (new transit terminal) · other: twenty-six months to complete constructionalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B New Transit Terminal, Main/Beale Site · other: Bus count, top level: 40 totalprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Main/Beale Site, Alternative B · other: Bus Terminal Section, Section B-BbuildingCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative B · alternative: No podium; no development above included in schemealternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative B · other: Costs exclude potential rail station, not assumed to be developed as part of projectprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative B · floor area sqft: Terminal Space 134,000 sq ft, cost 16,080,000projectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal, Alternative B · other: No costs included for interim bus operations which would have to be relocated during constructionprojectCity report: Transit terminal study
scanned page ↗
1993new transit terminal (Alternative A) · cost usd: $79 million estimated construction costalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · alternative: Alternative B, New Transit Terminal Main/Beale Site, mezzanine level planalternativeCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · other: Greyhound: 13 buses at mezzanine levelprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · other: Gray Line Commute: 1 bus at mezzanine levelprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · other: Amtrak: 3 buses at mezzanine levelprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · other: SF Misc. Carriers: 3 buses at mezzanine levelprojectCity report: Transit terminal study
scanned page ↗
1993New Transit Terminal Main/Beale Site · other: Total mezzanine level bus count: 20projectCity report: Transit terminal study
scanned page ↗
1993Alternative B New Transit Terminal · alternative: New transit terminal, Main/Beale site, undergroundalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal at Main/Beale Site · alternative: New transit terminal at Main/Beale site; central location near financial and retail districtsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal at Main/Beale Site · finding: reduces traffic conflicts by moving transit circulation away from First and Fremont StreetsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal at Main/Beale Site · other: minor private land acquisition and assembly requiredalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal at Main/Beale Site · other: use of Main/Beale site would foreclose some Terminal Separator Structure optionsalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative B - New Transit Terminal · alternative: New transit terminal at Main/Beale site, on grade and undergroundalternativeCity report: Transit terminal study
scanned page ↗
1993Alternative A - New Transit Terminal · alternative: New transit terminal at existing Transbay site, on grade and undergroundalternativeCity report: Transit terminal study
scanned page ↗

All 66 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0