San Francisco terminal
Named in the records1928–2025
47 records of San Francisco tie this place, 1928–2025: 20 decisions of the Board of Supervisors and 27 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 47: 20 Board decisions, 27 facts from city reports
- Years
- 1928–2025
What the records say
All 47 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1928 | Western Pacific Railroad line from San Francisco terminal to Redwood City · proposes: construct a railway line from its present terminal in San Francisco to Redwood City | project | City report: The San Francisco-San Mateo survey, 1928 scanned page ↗ |
| 1937-03-15 | Board considered endorsing Santa Fe Railway's plan to replace its Oakland ferry link with motor buses and a downtown San Francisco terminal. | passed | Board decision scanned page ↗ |
| 1947 | San Francisco terminal areas · finding: none of the terminal areas can absorb more than four additional lanes of cross-bay traffic in each direction | finding | City report: Report of Joint Army-Navy Board on an additional crossing of San Francisco Bay scanned page ↗ |
| 1956 | San Francisco Terminal · cost usd: $62,838,445 total construction cost estimate, optimum plan first-stage system | measure | City report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system scanned page ↗ |
| 1956 | San Francisco Terminal · other: 62,838 3g 72,903 (garbled OCR row; capital requirements table) | project | City report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system scanned page ↗ |
| 1956 | Present fare · other: does not include transfer privileges at the San Francisco terminal | finding | City report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system scanned page ↗ |
| 1956 | San Francisco Terminal and Transbay Crossing · other: Included in San Francisco first-stage capital estimate: San Francisco Terminal, 50 percent of Transbay Crossing, Segment 1 of [name withheld], Segment 1 and 50 percent of Segment 2 of Marin Route | measure | City report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system scanned page ↗ |
| 1968 | [name withheld] · jobs: sixty-five new drivers hired for the San Francisco terminal | measure | City report: Occupational profile, city of San Francisco scanned page ↗ |
| 1969 | Port of San Francisco Terminal · other: public grain elevator handling bulk grain and feedstuffs for export | agency | City report: Preliminary plan of study of San Francisco Bay area in-depth study : Appendix B : Coordination activities and comments from others scanned page ↗ |
| 1970 | M.V. Golden Gate · other: uses its lower deck for loading and unloading passengers at the San Francisco terminal | measure | City report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing scanned page ↗ |
| 1970 | M.V. Golden Gate · finding: lower deck loading was required to use the existing passenger float at the San Francisco terminal | finding | City report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing scanned page ↗ |
| 1970 | Golden Gate commuter ferryboat system · other: San Francisco terminal estimate assumes cost of pier is part of BARTD project, not chargeable to the ferryboat project | project | City report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing scanned page ↗ |
| 1976 | Port of San Francisco terminal complexes · finding: would require extensive renovation of existing finger piers and major land fills | finding | City report: San Francisco Bay area in-depth study : new facility analysis scanned page ↗ |
| 1978 | Golden Gate ferry terminal · built: 1978 | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1978 | San Francisco Terminal (Golden Gate Ferry) · built year: 1978 | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1984 | Southern Pacific/CalTrain rail extension · alternative: Alternatives analysis/feasibility study: extension of Southern Pacific/CalTrain rail service to a downtown San Francisco terminal | action | City report: An analysis, the financial feasibility of public transit recommendations in the San Francisco downtown plan scanned page ↗ |
| 1984 | San Francisco Terminal Control Area · other: Established for greater control over the mix of high performance air carrier aircraft with low performance general aviation VFR aircraft | finding | City report: Regional plan for San Francisco Bay Area naval shore activities : functional systems analyses/regional issues and options report scanned page ↗ |
| 1985 | Ferry Building, San Francisco terminal for travel corridors in Table 5 · other: Assumed San Francisco terminal for all corridors except the airport-to-airport route | site | City report: High speed water transit study for the San Francisco Bay Area scanned page ↗ |
| 1992 | Ferry Building ferry terminal · other: approximately 1.6 million passengers use terminal annually | site | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1992 | Golden Gate ferry terminal · other: landing space for two vessels at a time | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1992 | Golden Gate ferry terminal · other: protected waiting area for approximately 400 passengers | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1992 | San Francisco Terminal (Golden Gate Ferry) · other: landing space for two vessels at a time | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1992 | San Francisco Terminal (Golden Gate Ferry) · other: protected waiting area for approximately 400 passengers | building | City report: [Public information documents relating to Port of San Francisco waterfront plan project] scanned page ↗ |
| 1998 | Caltrain San Francisco Terminal · other: Caltrain San Francisco Terminal location | site | City report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco scanned page ↗ |
| 1998 | Caltrain San Francisco Terminal · other: approximately 11,300 daily boardings and alightings | measure | City report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco scanned page ↗ |
| 2000 | CalTrain San Francisco terminal · other: San Francisco terminal at Fourth and Townsend streets | site | City report: Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard scanned page ↗ |
| 2000-10-02 | Proposed equipment maintenance and operating agreement between San Francisco Terminal Equipment Company and the Airport was sent to committee. | referred | Board decision scanned page ↗ |
| 2000-10-02 | Proposed airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company was sent to the Finance and Labor Committee. | referred | Board decision scanned page ↗ |
| 2000-10-16 | Approved an equipment maintenance agreement between the Airport Commission and San Francisco Terminal Equipment Company LLC. | passed | Board decision scanned page ↗ |
| 2000-10-16 | Resolution approving an airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company LLC was adopted. | passed | Board decision scanned page ↗ |
| 2005 | An airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company was sent to the Budget and Finance Committee. | referred | Board decision scanned page ↗ |
| 2005-09-06 | Airport Commission's equipment maintenance agreement with San Francisco Terminal Equipment Company sent to Budget and Finance Committee. | referred | Board decision scanned page ↗ |
| 2012-07-31 | Board adopted an agreement with San Francisco Terminal Equipment Company to maintain and operate airport terminal equipment, up to $18M (≈ $26.4 million in 2026 dollars). | passed | Board decision scanned page ↗ |
| 2015-03-10 | Airport modification adds $3,000,000 (≈ $4.3 million in 2026 dollars) to San Francisco Terminal Equipment Company's agreement, raising the total to $21,000,000 (≈ $29.9 million in 2026 dollars); sent to budget committee. | referred | Board decision scanned page ↗ |
| 2015-03-10 | Modification adding $3,000,000 (≈ $4.3 million in 2026 dollars) to the airport's terminal equipment contract with San Francisco Terminal Equipment Company, sent to committee. | referred | Board decision scanned page ↗ |
| 2015-04-14 | Board approved a $3,000,000 (≈ $4.3 million in 2026 dollars) increase, to $21,000,000 (≈ $29.9 million in 2026 dollars) total, for airport terminal equipment services with San Francisco Terminal Equipment Company. | passed | Board decision scanned page ↗ |
| 2020-05-12 | Terminal 3 news and retail shop lease sent to committee | resolution | Board decision scanned page ↗ |
| 2020-09-22 | News and shop lease at Terminal 3 approved | passed | Board decision scanned page ↗ |
| 2020-09-22 | Terminal 3 news and retail store lease put forward | resolution | Board decision scanned page ↗ |
| 2021-04-27 | Airport retail lease with a $2,300,000 (≈ $2.9 million in 2026 dollars) yearly guarantee sent to committee | resolution | Board decision scanned page ↗ |
| 2021-07-20 | Shops lease approved | passed | Board decision scanned page ↗ |
| 2021-07-20 | Terminal 2 retail market lease proposed for MRG San Francisco | resolution | Board decision scanned page ↗ |
| 2025-09-02 | Three more shops proposed for the Terminal 2 retail market | resolution | Board decision scanned page ↗ |
| 2025-10-07 | Three more shops approved for Terminal 2 at the airport | passed | Board decision scanned page ↗ |
| 2025-10-07 | Three more shops approved for the Terminal 2 retail market | resolution | Board decision scanned page ↗ |
| 1985 | Port of Oakland ACV demonstration San Francisco terminal · event: terminal placed in operation | event | City report: High speed water transit study for the San Francisco Bay Area scanned page ↗ |
| 1984 | CalTrain San Francisco Terminal Relocation [name withheld] · cost usd: total construction and right of way acquisition cost $290 million in 1984 dollar value | finding | City report: Transbay area plan : background data report scanned page ↗ |
All 47 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0