Qipudata
San Francisco · v0.7.1
qipu data›San Francisco›Places›San Francisco terminal

San Francisco terminal

Named in the records1928–2025

47 records of San Francisco tie this place, 1928–2025: 20 decisions of the Board of Supervisors and 27 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
47: 20 Board decisions, 27 facts from city reports
Years
1928–2025

What the records say

All 47 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1928Western Pacific Railroad line from San Francisco terminal to Redwood City · proposes: construct a railway line from its present terminal in San Francisco to Redwood CityprojectCity report: The San Francisco-San Mateo survey, 1928
scanned page ↗
1937-03-15Board considered endorsing Santa Fe Railway's plan to replace its Oakland ferry link with motor buses and a downtown San Francisco terminal.passedBoard decision
scanned page ↗
1947San Francisco terminal areas · finding: none of the terminal areas can absorb more than four additional lanes of cross-bay traffic in each directionfindingCity report: Report of Joint Army-Navy Board on an additional crossing of San Francisco Bay
scanned page ↗
1956San Francisco Terminal · cost usd: $62,838,445 total construction cost estimate, optimum plan first-stage systemmeasureCity report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system
scanned page ↗
1956San Francisco Terminal · other: 62,838 3g 72,903 (garbled OCR row; capital requirements table)projectCity report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system
scanned page ↗
1956Present fare · other: does not include transfer privileges at the San Francisco terminalfindingCity report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system
scanned page ↗
1956San Francisco Terminal and Transbay Crossing · other: Included in San Francisco first-stage capital estimate: San Francisco Terminal, 50 percent of Transbay Crossing, Segment 1 of [name withheld], Segment 1 and 50 percent of Segment 2 of Marin RoutemeasureCity report: Organizational and financial aspects of the proposed San Francisco Bay Area rapid transit system
scanned page ↗
1968[name withheld] · jobs: sixty-five new drivers hired for the San Francisco terminalmeasureCity report: Occupational profile, city of San Francisco
scanned page ↗
1969Port of San Francisco Terminal · other: public grain elevator handling bulk grain and feedstuffs for exportagencyCity report: Preliminary plan of study of San Francisco Bay area in-depth study : Appendix B : Coordination activities and comments from others
scanned page ↗
1970M.V. Golden Gate · other: uses its lower deck for loading and unloading passengers at the San Francisco terminalmeasureCity report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing
scanned page ↗
1970M.V. Golden Gate · finding: lower deck loading was required to use the existing passenger float at the San Francisco terminalfindingCity report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing
scanned page ↗
1970Golden Gate commuter ferryboat system · other: San Francisco terminal estimate assumes cost of pier is part of BARTD project, not chargeable to the ferryboat projectprojectCity report: Golden Gate commuter ferryboat system : San Francisco-Marin crossing
scanned page ↗
1976Port of San Francisco terminal complexes · finding: would require extensive renovation of existing finger piers and major land fillsfindingCity report: San Francisco Bay area in-depth study : new facility analysis
scanned page ↗
1978Golden Gate ferry terminal · built: 1978buildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1978San Francisco Terminal (Golden Gate Ferry) · built year: 1978buildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1984Southern Pacific/CalTrain rail extension · alternative: Alternatives analysis/feasibility study: extension of Southern Pacific/CalTrain rail service to a downtown San Francisco terminalactionCity report: An analysis, the financial feasibility of public transit recommendations in the San Francisco downtown plan
scanned page ↗
1984San Francisco Terminal Control Area · other: Established for greater control over the mix of high performance air carrier aircraft with low performance general aviation VFR aircraftfindingCity report: Regional plan for San Francisco Bay Area naval shore activities : functional systems analyses/regional issues and options report
scanned page ↗
1985Ferry Building, San Francisco terminal for travel corridors in Table 5 · other: Assumed San Francisco terminal for all corridors except the airport-to-airport routesiteCity report: High speed water transit study for the San Francisco Bay Area
scanned page ↗
1992Ferry Building ferry terminal · other: approximately 1.6 million passengers use terminal annuallysiteCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Golden Gate ferry terminal · other: landing space for two vessels at a timebuildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992Golden Gate ferry terminal · other: protected waiting area for approximately 400 passengersbuildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992San Francisco Terminal (Golden Gate Ferry) · other: landing space for two vessels at a timebuildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1992San Francisco Terminal (Golden Gate Ferry) · other: protected waiting area for approximately 400 passengersbuildingCity report: [Public information documents relating to Port of San Francisco waterfront plan project]
scanned page ↗
1998Caltrain San Francisco Terminal · other: Caltrain San Francisco Terminal locationsiteCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
1998Caltrain San Francisco Terminal · other: approximately 11,300 daily boardings and alightingsmeasureCity report: Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco
scanned page ↗
2000CalTrain San Francisco terminal · other: San Francisco terminal at Fourth and Townsend streetssiteCity report: Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard
scanned page ↗
2000-10-02Proposed equipment maintenance and operating agreement between San Francisco Terminal Equipment Company and the Airport was sent to committee.referredBoard decision
scanned page ↗
2000-10-02Proposed airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company was sent to the Finance and Labor Committee.referredBoard decision
scanned page ↗
2000-10-16Approved an equipment maintenance agreement between the Airport Commission and San Francisco Terminal Equipment Company LLC.passedBoard decision
scanned page ↗
2000-10-16Resolution approving an airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company LLC was adopted.passedBoard decision
scanned page ↗
2005An airport equipment maintenance and operating agreement with San Francisco Terminal Equipment Company was sent to the Budget and Finance Committee.referredBoard decision
scanned page ↗
2005-09-06Airport Commission's equipment maintenance agreement with San Francisco Terminal Equipment Company sent to Budget and Finance Committee.referredBoard decision
scanned page ↗
2012-07-31Board adopted an agreement with San Francisco Terminal Equipment Company to maintain and operate airport terminal equipment, up to $18M (≈ $26.4 million in 2026 dollars).passedBoard decision
scanned page ↗
2015-03-10Airport modification adds $3,000,000 (≈ $4.3 million in 2026 dollars) to San Francisco Terminal Equipment Company's agreement, raising the total to $21,000,000 (≈ $29.9 million in 2026 dollars); sent to budget committee.referredBoard decision
scanned page ↗
2015-03-10Modification adding $3,000,000 (≈ $4.3 million in 2026 dollars) to the airport's terminal equipment contract with San Francisco Terminal Equipment Company, sent to committee.referredBoard decision
scanned page ↗
2015-04-14Board approved a $3,000,000 (≈ $4.3 million in 2026 dollars) increase, to $21,000,000 (≈ $29.9 million in 2026 dollars) total, for airport terminal equipment services with San Francisco Terminal Equipment Company.passedBoard decision
scanned page ↗
2020-05-12Terminal 3 news and retail shop lease sent to committeeresolutionBoard decision
scanned page ↗
2020-09-22News and shop lease at Terminal 3 approvedpassedBoard decision
scanned page ↗
2020-09-22Terminal 3 news and retail store lease put forwardresolutionBoard decision
scanned page ↗
2021-04-27Airport retail lease with a $2,300,000 (≈ $2.9 million in 2026 dollars) yearly guarantee sent to committeeresolutionBoard decision
scanned page ↗
2021-07-20Shops lease approvedpassedBoard decision
scanned page ↗
2021-07-20Terminal 2 retail market lease proposed for MRG San FranciscoresolutionBoard decision
scanned page ↗
2025-09-02Three more shops proposed for the Terminal 2 retail marketresolutionBoard decision
scanned page ↗
2025-10-07Three more shops approved for Terminal 2 at the airportpassedBoard decision
scanned page ↗
2025-10-07Three more shops approved for the Terminal 2 retail marketresolutionBoard decision
scanned page ↗
1985Port of Oakland ACV demonstration San Francisco terminal · event: terminal placed in operationeventCity report: High speed water transit study for the San Francisco Bay Area
scanned page ↗
1984CalTrain San Francisco Terminal Relocation [name withheld] · cost usd: total construction and right of way acquisition cost $290 million in 1984 dollar valuefindingCity report: Transbay area plan : background data report
scanned page ↗

All 47 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0