26 records of San Francisco tie this place, 1981–2002: 0 decisions of the Board of Supervisors and 26 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 26: 0 Board decisions, 26 facts from city reports
- Years
- 1981–2002
What the records say
All 26 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1981 | SF distribution system · other: average invested cost of distribution plant per customer $845 in SF, versus $990 for PG&E system (about 85%) | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1981 | SF distribution system · other: SF net plant approximately 85% of system average | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1996 | SF distribution system · finding: A significant portion of the SF distribution system's assets have service lives that exceed 30 years | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF municipalization acquisition bonds · other: Effective interest rate of 7.5% on bonds to acquire PG&E SF distribution system | measure | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | CCSF cost to acquire PG&E SF distribution system · finding: three factors determine acquisition cost: valuation methods allowed in condemnation case, application of the method to SF assets, and the valuation date | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | PG&E SF distribution system · other: net-income-method value $505 million | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | PG&E SF distribution system · cost usd: physical severance costs $5 million | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | PG&E SF distribution system · finding: No comparable sales could realistically be used to set a transfer price | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | PG&E SF distribution system · finding: useful and serviceable condition | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF Distribution System Acquisition Valuation Premium · other: +5.9% / -0.4% / +10.3% change across base, low and high cases | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system municipalization · cost usd: about $800-million maximum bonds at 4 cents per kWh | alternative | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system municipalization · cost usd: about $315-million maximum bonds at 5 cents per kWh | alternative | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system municipalization · other: debt capacity between $300-million and $800-million | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system acquisition cost · finding: Acquisition cost is one of the two most important variables determining whether municipalization lowers or raises rates | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system acquisition cost · finding: A low acquisition cost increases the probability that a municipal electric utility will produce lower rates | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | PG&E SF distribution system · other: ETAG estimate of original cost and replacement value of PG&E's SF distribution system and associated assets | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF Distribution System Acquisition Valuation Premium · finding: Illusory item in the CCSF rates column of Table ES-1 | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1997 | SF distribution system (PG&E) · other: serves 334,000 electricity customers in SF | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2001 | PG&E SF distribution system · finding: RCNLD value escalated to 2001 is much higher than the study's own estimate, which uses economic depreciation | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2001 | PG&E SF distribution system · cost usd: $505-million (Income Capitalization method, [name withheld] case) | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2001 | PG&E SF distribution system · cost usd: $795-million (RCL-SL method, [name withheld]) | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2002 | PG&E SF distribution system · other: net present value of additional equity return in SF $183 million | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2002 | PG&E SF distribution system · other: discount rate of PG&E equity return 11.6% | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2002 | PG&E SF distribution system · other: return on equity differential forecast for 2002 through 2031 | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 1982 | PG&E SF distribution system · cost usd: RCNLD of $795-million as of year end 1982 (PG&E valuation) | measure | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |
| 2001 | PG&E SF distribution system · cost usd: $999-million (RCL-SF method, [name withheld] case) | finding | City report: Final report on the feasibility of electric system municipalization in San Francisco scanned page ↗ |