Transbay Area
Named in the records1980–2025
73 records of San Francisco tie this place, 1980–2025: 31 decisions of the Board of Supervisors and 42 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 73: 31 Board decisions, 42 facts from city reports
- Years
- 1980–2025
What the records say
The 60 most telling of its 73 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1981 | Transbay area plan background data report · other: Table 5: Downtown Transit Ridership and Capacity: 1981, 1985, 1989 and 1993 | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1988 | Transbay Area Plan · finding: Police facilities policy: combine police facilities with other public uses whenever multi-use facilities support planning goals | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1990 | Transbay area plan background data report · other: Table 18: projected 1990 to 2010 change in one-way daily person work trips to San Francisco, by origin and mode; destinations include C-3 West, C-3 East and Supervisor Districts | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1992 | Transbay area plan background data report · other: Table 1: 1992 Weekday Transit Ridership at and Around the Transbay Transit Terminal | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1992 | Transbay area plan background data report · other: Table 2: 1992-93 Space Utilization at the Transbay Transit Terminal Area | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1994 | CalTrain Extension · cost usd: $216.8 million identified Track 1 funding for preferred alternative | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Terminal Separator Structure · event: demolished, providing additional vacant land around the Transbay Transit Terminal | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay area study area · other: Approximately 110 buildings constructed of unreinforced masonry | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan and Implementation Program · other: Caltrans and the City decided to fund the Transbay Area Plan and Implementation Program and a detailed analysis of the Main/Mission/Beale/Howard site | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay area related transportation projects · other: Related transportation projects diagram including Northern Embarcadero Roadway, F-Line Historic Streetcar, Muni-Metro Turnback, Muni Terminal, Ferry Terminal Expansion, Mid-Embarcadero Roadway, Terminal Separator Structure ROW, Muni-Metro Extension, Southern Embarcadero Roadway, King Boulevard | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan · finding: Commerce and Industry Element objectives and policies are applicable to the Transbay Area Plan | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan approved/proposed development · other: Approved/proposed development sites shown in Figure 19 include 101 Second, 150 California, 71 Natoma, 524 Howard, 300 Howard, 250 Steuart (Gap Headquarters), 187 Third, 222 Second, 299 Second and 301 Bryant | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | CalTrain extension alignment · other: Specific route of the CalTrain extension is currently being studied in a variety of alignments | action | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay area study area · other: 41 architecturally significant buildings | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995-10-30 | Supervisor Hsieh proposed urging an alternative for the Transbay area plan and Caltrain extension; referred to Budget Committee. | referred | Board decision scanned page ↗ |
| 1996 | Transbay layover lot relocation · recommendation: MUNI leadership to dedicate staff resources now to analyzing alternative layover lot sites | recommendation | City report: Management audit of the San Francisco Municipal Railway scanned page ↗ |
| 1996 | Transbay area catalyst sites · other: six important publicly-owned catalyst sites | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay preliminary land use alternative market program · other: 800,000 sq.ft. of classrooms, administration, library, student center, student residences & museum | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay preliminary land use alternative market program · other: 3,700 - 5,400 living units (live-work/lofts & mid-rise + high-rise apartments) | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay preliminary land use alternative market program · other: 800,000 - 2.8 million sq.ft. of office & related mixed use space | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay preliminary land use alternative market program · other: 40,000 - 80,000 sq.ft. street retail & 100,000 sq.ft. community destination retail | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay 2020 · population: up to 10,000 people | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay sub-areas · other: Five sub-areas: Essex Park, Lower Folsom Street, Rincon Hill, Transbay Central east of First Street, and the Second Street corridor | site | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1996 | Transbay area opportunity sites · other: Prime Opportunity sites along the alleys, on Second Street, on Howard and Folsom Streets | site | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1997 | Transbay Terminal block · finding: afternoon outbound traffic on First Street can reach bottleneck levels | finding | City report: M.H. deYoung Memorial Museum site selection study scanned page ↗ |
| 2005 | A hearing on a redevelopment plan for the Transbay area was scheduled before the Board sitting as a committee. | hearing | Board decision scanned page ↗ |
| 2005-02-15 | Proposed: new building rules for Transbay area. | pending | Board decision scanned page ↗ |
| 2005-02-15 | Proposed: Transbay area's land-use map changed. | pending | Board decision scanned page ↗ |
| 2005-03-29 | Transbay area map changes delayed until April 5; still pending. | pending | Board decision scanned page ↗ |
| 2005-03-29 | Transbay area map changes delayed again to April 5; still pending. | pending | Board decision scanned page ↗ |
| 2005-04-05 | Proposed Transbay area map changes delayed to May 10. | pending | Board decision scanned page ↗ |
| 2005-04-05 | Proposed Transbay area map changes delayed to May 10. | pending | Board decision scanned page ↗ |
| 2005-05-10 | General Plan change for Transbay area delayed to June 14. | pending | Board decision scanned page ↗ |
| 2005-06-14 | Transbay area zoning map change sent back to committee. | pending | Board decision scanned page ↗ |
| 2005-06-14 | Transbay area plan changes passed first vote, amended. | pending | Board decision scanned page ↗ |
| 2005-06-14 | Transbay area plan changes passed first vote, amended. | pending | Board decision scanned page ↗ |
| 2006-05-09 | New building size rules for Transbay area adopted. | passed | Board decision scanned page ↗ |
| 2006-05-09 | Zoning map changes for Transbay area; no vote shown. | unknown | Board decision scanned page ↗ |
| 2014-01-08 | Board held a hearing on consent to subordinate an affordable housing site in the Transbay area for the Transit Center. | hearing | Board decision scanned page ↗ |
| 2014-09-30 | Resolution consenting to a variation easing the affordable housing requirement at 181 Fremont Street, Transbay area; sent to committee, no final vote found | referred | Board decision scanned page ↗ |
| 2014-11-04 | Deal approved for 181 Fremont Street project in Transbay area | passed | Board decision scanned page ↗ |
| 2014-11-04 | The City approved a development agreement with 181 Fremont Street, LLC for 181 Fremont Street in the Transbay area. | passed | Board decision scanned page ↗ |
| 2015-06-16 | Transbay area office buildings get new size limits | passed | Board decision scanned page ↗ |
| 2015-06-16 | Transbay area office buildings get new size limits. | passed | Board decision scanned page ↗ |
| 2025-04-15 | Transbay area streets given official names | passed | Board decision scanned page ↗ |
| 1995 | Peninsula Commute Service San Francisco Downtown Station Relocation Study (Draft EIS/EIR) · alternative: alternatives all include CalTrain extension into the Transbay Area | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1996 | Transbay 2020 · alternative: Preliminary Preferred Land Use and Urban Design Alternative | project | City report: Transbay area plan : Transbay 2020, preliminary land use and urban design alternative scanned page ↗ |
| 1995 | Transbay area · other: Land use by parcel map, Figure 12, Transbay Area Plan, San Francisco Planning Department, February 1995 | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay area plan · other: Background Data Report | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan · other: Background Data Report | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | CalTrain extension into the Transbay Area · finding: Extension of high-speed service into the Transbay Area, where BART and Muni Metro connections are available, is considered important | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | High-speed rail extension into the Transbay Area · finding: Extension of high-speed rail service into the Transbay Area, with direct BART and Muni Metro connections, is considered important | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | High-speed rail extension to downtown San Francisco · finding: Provision of high-speed rail to downtown San Francisco is considered a necessity to make the service marketable | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · alternative: Two alternative sites considered by the Joint Powers Board for sharing the CalTrain extension | alternative | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan · finding: Proposition B funding cannot be directly used for the Terminal Area Plan | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | CalTrain Downtown Terminal relocation · finding: Pedestrian safety and street improvement projects from terminal relocation could be funded at Transportation Authority discretion | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | CalTrain Downtown Terminal relocation · finding: Public funding strategies for the new or updated terminal need to be developed within constrained transportation funding | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan and CalTrain Downtown Relocation study · recommendation: Close coordination of the Transbay Area Plan and CalTrain Downtown Relocation study is needed | recommendation | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Area Plan and CalTrain Downtown Relocation study · finding: Impact of these studies on the CMP network needs to be analyzed | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | CalTrain Downtown Terminal relocation · finding: High speed rail service feasibility needs to be analyzed | finding | City report: Transbay area plan : background data report scanned page ↗ |
All 73 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0