Transbay Transit Terminal building

Named in the records1992–1995

11 records of San Francisco tie this place, 1992–1995: 0 decisions of the Board of Supervisors and 11 facts read from city reports. Open the full list, with filters for years, kind and outcome.

Kind
Named in the records
Records
11: 0 Board decisions, 11 facts from city reports
Years
1992–1995

What the records say

All 11 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.

WhenWhat the record saysOutcomeSource
1992Muni · other: 1,003 weekday buses using the hump area outside the TerminaleventCity report: Transbay area plan : background data report
scanned page ↗
1992AC Transit · other: 653 weekday bus arrivals and departures at Terminal buildingeventCity report: Transbay area plan : background data report
scanned page ↗
1992AC Transit · other: 653 arrivals and departures on weekdays at the Terminal building (1992)measureCity report: Transit terminal study
scanned page ↗
1992Transbay Transit Terminal · finding: Terminal building needed substantial upgrades to meet current seismic and other fire/life/safety codesfindingCity report: Transit terminal study
scanned page ↗
1993Transbay Transit Terminal building structure · other: occupies portions of three city blocks between Second, Mission, Beale and Howard StreetsbuildingCity report: Transit terminal study
scanned page ↗
1993Transbay Transit Terminal Building Renovation · cost usd: TOTAL 29,144,000projectCity report: Transbay Transit Terminal current and future needs study : staff working paper : final
scanned page ↗
1993Transbay Transit Terminal Building Renovation Project · other: Figure 2 - Transbay Transit Terminal Building Renovation Project BudgetprojectCity report: Transbay Transit Terminal current and future needs study : staff working paper : final
scanned page ↗
1993Transbay Transit Terminal building · other: Caltrans proceeded with temporary replacement of the roof and seismic bracing and shear wallsactionCity report: Transbay area plan : background data report
scanned page ↗
1993Transbay Transit Terminal building · other: first phase improvements: temporary roof replacement, seismic bracing and shear walls, proceedingactionCity report: Transit terminal study
scanned page ↗
1994AC Transit · other: 769 buses and 14,208 passenger arrivals and departureseventCity report: Transbay area plan : background data report
scanned page ↗
1995Transbay Transit Terminal · finding: existing terminal building lacks capacity for projected bus service needs without significant modificationsfindingCity report: Transbay area plan : background data report