Transbay Transit Terminal bus deck
Named in the records1958–1995
13 records of San Francisco tie this place, 1958–1995: 0 decisions of the Board of Supervisors and 13 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 13: 0 Board decisions, 13 facts from city reports
- Years
- 1958–1995
What the records say
All 13 records, in date order. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1958 | Transbay Transit Terminal bus deck · event: removal of rail service; AC Transit and Greyhound commuter service became the only bus deck operators | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1980 | Transbay Transit Terminal bus deck · finding: nearly 700 more weekday vehicle arrivals and departures in 1980 than in 1992/1993 | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1981 | SFBATTA Phase III Project Development Proposal · finding: three operators besides AC Transit used the bus deck | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Alternative X · other: Bus deck reconfigured from three lanes to four lanes | alternative | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · other: bus deck with three lanes and 41 bus stop locations | building | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal bus deck · other: all 27 bus stop locations reserved for public providers fully and continuously utilized during peak periods | finding | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal bus deck · other: 8 of 13 bus stop locations reserved for Greyhound utilized during peak periods | finding | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1995 | Transbay Transit Terminal bus deck · other: AC Transit provides service exclusively to the bus deck | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal Bus Deck Interim Seismic Strengthening · proposes: strengthening the vertical columns of the bus deck by installing 29 structural braces to the existing roofing frame | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal Bus Deck Interim Seismic Strengthening · finding: Only impact identified for preferred alternative is modification of an historic structure | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal bus deck interim seismic strengthening · other: Final EIR assessing environmental impacts of strengthening the terminal | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal Bus Deck Interim Seismic Strengthening EIR · event: EIR certified as complying with CEQA | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal bus deck · finding: much more heavily utilized in the early 1980's than today | finding | City report: Transbay area plan : background data report scanned page ↗ |
All 13 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0