Transbay Transit Terminal
Named in the records1939–2013
283 records of San Francisco tie this place, 1939–2013: 8 decisions of the Board of Supervisors and 275 facts read from city reports. Open the full list, with filters for years, kind and outcome.
- Kind
- Named in the records
- Records
- 283: 8 Board decisions, 275 facts from city reports
- Years
- 1939–2013
What the records say
The 60 most telling of its 283 records, in date order: the ones an editor picked first, then the highest scored. The one-line summaries were written by a language model from the printed page; open the page to check the wording.
| When | What the record says | Outcome | Source |
|---|---|---|---|
| 1939 | Transbay Transit Terminal · built: completed | building | City report: Transbay area plan : background data report scanned page ↗ |
| 1939 | Transbay Transit Terminal · built year: opened in 1939 | building | City report: Transbay area plan : background data report scanned page ↗ |
| 1939 | Transbay Transit Terminal · built: completed 1939 as part of Bay Bridge construction | building | City report: Transit terminal study scanned page ↗ |
| 1939 | Transbay Transit Terminal · built: constructed as part of the San Francisco-Oakland Bay Bridge railway | building | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1958 | Transbay Transit Terminal bus deck · event: removal of rail service; AC Transit and Greyhound commuter service became the only bus deck operators | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1959 | Transbay Transit Terminal · other: revamped to serve as a bus terminal | building | City report: Transbay area plan : background data report scanned page ↗ |
| 1959 | Transbay Transit Terminal · use: converted to bus only use | building | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1970 | Tram service to Transbay Transit Terminal and BART station · proposes: Trams to serve the Transbay Transit Terminal and the BART station at the Pine, Beale, and Market intersection | alternative | City report: Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report scanned page ↗ |
| 1970 | Transbay Transit Terminal · finding: Contributes to commuter flow each morning; routes needed to connect to Market Street area | site | City report: Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report scanned page ↗ |
| 1972 | Transbay Transit Terminal · recommendation: study recommended replacement of the existing Terminal and construction of a mixed use long-haul and commuter bus transit terminal and office complex | event | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1972-06-26 | City backs new transit terminal at Transbay site | passed | Board decision scanned page ↗ |
| 1972-06-26 | City backs new transit terminal at Transbay site. | passed | Board decision scanned page ↗ |
| 1974 | San Francisco Bay Area Transportation Terminal Authority regional transit terminal · proposes: regional transit terminal in San Francisco on and immediately adjacent to the site of the existing Transbay Transit Terminal | project | City report: Transit development program for the San Francisco Bay Area scanned page ↗ |
| 1974 | San Francisco Bay Area Transportation Terminal Authority · cost usd: $75,000 state appropriation to match other funds for terminal development | agency | City report: Transit development program for the San Francisco Bay Area scanned page ↗ |
| 1975 | San Francisco Bay Area Transportation Terminal Authority (SFBATTA) · lead agency: established to oversee the operations and planning of the Terminal | agency | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1978-12-26 | Pelosi asked for a hearing on a new regional transit terminal at the Transbay Transit Terminal site; referred to Streets and Transportation Committee. | referred | Board decision scanned page ↗ |
| 1978 | SFBATTA Regional Transit Terminal Facility · other: Study of bus transit facilities and service needs, including joint development potential and urban design issues (Phase III) | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1980 | Transbay Transit Terminal bus deck · finding: nearly 700 more weekday vehicle arrivals and departures in 1980 than in 1992/1993 | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1981 | SFBATTA Phase III Project Development Proposal · finding: three operators besides AC Transit used the bus deck | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1991 | Transbay Transit Terminal · other: Caltrans operating costs approximately $2.9 million in 1991-92 | building | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1992 | Muni · other: 1,003 weekday buses using the hump area outside the Terminal | event | City report: Transbay area plan : background data report scanned page ↗ |
| 1992 | Passenger Loading/Unloading (Caltrans Property) · floor area sqft: 33,400 sqft, Caltrans Property | property_record | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · owned by city: California Department of Transportation (Caltrans) | building | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · other: Board deferred action because Transit Needs Study not yet completed by MTC and Caltrans | event | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · owned by city: Caltrans | building | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal · other: Four S.F. MUNI bus lines access the hump at the mezzanine level (Second Floor) | site | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal mezzanine level hump · finding: S.F. MUNI provides over 1,000 arrivals and departures from the hump each day | finding | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal area development solicitation · other: Caltrans and City plans to jointly solicit private sector proposals to develop and potentially modify the area | project | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal Transit Needs Study · lead agency: Metropolitan Transportation Commission and Caltrans District 4 | project | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal · other: Caltrans agreed to postpone additional improvements for six months to explore joint development opportunities | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Transbay Transit Terminal · owned by city: Caltrans, which owns and operates the Terminal and its bus ramps | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · owned by city: Caltrans | site | City report: Transit terminal study scanned page ↗ |
| 1993 | Muni hump in front of Transbay Transit Terminal · other: improved lighting, bus shelters, and roadway paving proposed | measure | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal · finding: Existing hump area is not adequate to accommodate Muni's bus and potential rail services | finding | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal · recommendation: Redesigned off-street, at or close to grade area for Muni bus loading and rail services, with vertical clearance for overhead catenary | recommendation | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1994-12-05 | The Board adopted, as amended, a resolution designating a Transbay Transit Terminal redevelopment survey area at Beale and Market Streets. | passed | Board decision scanned page ↗ |
| 1994-12-05 | Transbay Transit Terminal survey area at Beale and Market Streets adopted as amended for redevelopment study. | passed | Board decision scanned page ↗ |
| 1995 | Transbay Transit Terminal area traffic · finding: traffic volumes on surface streets increased in South of Market area, particularly near Transbay Terminal, after earthquake damage and freeway removal | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · finding: post-earthquake freeway access to East Bay and Peninsula only provided through ramps in South of Market area | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · recommendation: demolition of the existing facility and replacement with a new terminal | recommendation | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · other: central downtown location with bus access ramps; Caltrans and Muni occupy property on the north side (hump and crescent) | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · owned by city: California Department of Transportation (Caltrans) | building | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal north outside areas · owned by city: Caltrans property, heavily used by Muni (hump) and SamTrans (crescent) | site | City report: Transbay area plan : background data report scanned page ↗ |
| 1996 | MUNI headquarters building · proposes: six sites under consideration for new headquarters building | project | City report: Management audit of the San Francisco Municipal Railway scanned page ↗ |
| 1996 | Transbay Transit Terminal site · other: MUNI has started analysis of financial feasibility of developing the site | site | City report: Management audit of the San Francisco Municipal Railway scanned page ↗ |
| 1996-03-04 | Main and Beale Streets favoured for a new Transbay transit terminal | passed | Board decision scanned page ↗ |
| 1997-05-12 | Endorsement of a Main/Beale South design for a replacement Transbay transit terminal, urging the Mayor to complete planning. | passed | Board decision scanned page ↗ |
| 1993 | Transbay Transit Terminal signage, landscaping and painting improvements · other: federal Transportation Enhancements funding application by Caltrans | action | City report: Transbay Transit Terminal current and future needs study : staff working paper : final scanned page ↗ |
| 1993 | Transbay Transit Terminal · proposes: Mayor asked Caltrans to consider removal of the Terminal and replacement with a smaller facility | event | City report: Transit terminal study scanned page ↗ |
| 1995 | Study of the Transbay Transit Terminal (Caltrans District 4 Right of Way Office) · finding: Not relevant due to dated assumptions; status superseded | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal · other: Board of Supervisors resolution requesting Caltrans work with City to study alternatives to rehabilitation of the Terminal and reconstruction of the Terminal Separator Structure | project | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Seismic Investigation of the Transbay Transit Terminal Site (Caltrans Translab, November 1973) · finding: analysis of ground under building site, no reference to the structure | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1995 | Transbay Transit Terminal Historic Resource Evaluation Report · finding: Focuses on architectural elements that contribute significantly to the Terminal's historical landmark status and details how they have been compromised | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Transit Needs Study staff working paper · other: Prepared by MTC and Caltrans to identify current uses, deficiencies and future needs of the Transbay Transit Terminal | finding | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal · other: Transit program requirement based on the October 1993 MTC/Caltrans Staff Working Paper | project | City report: Transit terminal study scanned page ↗ |
| 1995 | Transit Needs Study staff working paper · other: Staff working paper prepared by MTC and Caltrans to identify existing uses, deficiencies and future needs of the Transbay Transit Terminal | finding | City report: Transbay area plan : background data report scanned page ↗ |
| 1993 | Transbay Transit Terminal and Terminal Separator Structure issues · event: Board of Supervisors to report back to Caltrans on its position | event | City report: Transit terminal study scanned page ↗ |
| 1993 | Transbay Transit Terminal area · rezoned: Downtown Plan zoned area around the Terminal for high density development | event | City report: Transit terminal study scanned page ↗ |
| 1976 | Regional transit terminal project development (Transbay Transit Terminal site) · cost usd: not less than $682,000 | project | City report: Transit development program for the San Francisco Bay Area scanned page ↗ |
| 1995 | Transbay Transit Terminal joint real estate development · event: Caltrans drafted a Request For Proposal in which the City of San Francisco was asked to jointly participate | event | City report: Transbay area plan : background data report scanned page ↗ |
All 283 records, with filters · this place's data as JSON · release v0.7.1 · CC0 1.0