Market Street development : an analysis 1965
City and County of San Francisco, Market Street Design Task Force
Report recommendationPublic transit buses operating on the street surface can best operate from the curb lane with bus stops coordinated to provide direct service to subway stations. scan 6
Public transit buses operating on the street surface can best operate from the curb lane with bus stops coordinated to provide direct service to subway stations.
Report recommendationThe need varies along the length of the street, and the final design should recognize this fact. scan 6
The need varies along the length of the street, and the final design should recognize this fact.
Street and sidewalk-widths and uses 1966
City and County of San Francisco, Transit Task Force
Report recommendationReport No. 3 of the Consultants, submitted on June 28, 1965, did develop and recommend such a scheme, identified in that Report as Design Proposal B. scan 20
Report No. 3 of the Consultants, submitted on June 28, 1965, did develop and recommend such a scheme, identified in that Report as Design Proposal B.
Report recommendationThat proposal, refined and studied in more detail than was then possible, is basically Circulation Plan Four- Lanes B as described in the present Report. scan 20
That proposal, refined and studied in more detail than was then possible, is basically Circulation Plan Four- Lanes B as described in the present Report.
Report recommendationThe street cars will be moved underground leaving buses as the only transit vehicles on the street. scan 86
The street cars will be moved underground leaving buses as the only transit vehicles on the street.
FindingThe five lane plan has almost nothing to recommend it either from a traffic, transit, service and delivery or pedestrian point of view. scan 98
The five lane plan has almost nothing to recommend it either from a traffic, transit, service and delivery or pedestrian point of view.
FindingThe four lane Scheme C provides well for pedestrians. It offers some advantages for bus operations which are still questionable, however. scan 98
The four lane Scheme C provides well for pedestrians. It offers some advantages for bus operations which are still questionable,however.
FindingHowever, it is the least desirable plan for pedestrians and from the stand point of improving the appearance of Market Street. scan 98
However, it is the least desirable plan for pedestrians and from the stand point of improving the appearance of Market Street.
Analysis of operating alternatives for Market Street trolley coach lines 1975
San Francisco Municipal Railway. Transit Planning Section
Report recommendationThe present value of that fleet today, using a municipal bond rate of 6 1/2% would be $1,516,563.04. scan 48
The present value of that fleet today, using a municipal bond rate of 6 1/2% would be $1,516,563.04.
Report recommendationAlternative C would install an additional overhead crossing of Market at Seventh Street, causing visual intrusion at that point. scan 66
Alternative C would install an additional overhead crossing of Market at Seventh Street, causing visual intrusion at that point.
Annual report 1975
San Francisco Public Utilities Commission. Hetch Hetchy Water and Power Dept
FindingPlans and specifications were prepared, and bids received, for constructing manholes and concreteencased duct banks in Market Street between 7th and 8th Streets. scan 44
Plans and specifications were prepared, and bids received, for constructing manholes and concrete- encased duct banks in Market Street between 7th and 8th Streets.
Market Street planning project, interim report 1984
Public Utilities Commission, City and County of San Francisco
Board decision citedResolution No. 160-83, February 1983 scan 2 Board decision
In February 1983, the San Francisco Board of Supervisors unanimously adopted Resolution 160-83, amending City policy with respect to the Market Street Beautification Project
Board decision citedResolution No. 116-68, 1968 scan 3 Board decision
1968 (Res. 116-68) Adopted a specific design plan for Market Street and adjacent areas which envisioned the elimination of streetcar and trolley bus service
BackgroundThe 1968 Plan foresaw Market Street passing through a downtown with four districts identified along its length. scan 5
The 1968 Plan foresaw Market Street passing through a downtown with four districts identified along its length.
FindingTwenty years later, only portions of this grand urban design plan have been achieved. scan 5
Twenty years later, only portions of this grand urban design plan have been achieved.
Report recommendationMinimum lane width for right turning traffic should be 10 feet. scan 11
Minimum lane width for right turning traffic should be 10 feet.
Report recommendationTwo articulated buses, which will be the longest vehicles to be served, require 110 feet of lineal curb space for loading. scan 16
Two articulated buses, which will be the longest vehicles to be served, require 110 feet of lineal curb space for loading.
South of Market rezoning study : housing, business activity, neighborhood livability, research findings 1985
City and County of San Francisco, Department of City Planning
FindingThe northern edge along Market and Mission Streets feature tall buildings as does the more intensely-developed commercial areas east of Fourth Street. scan 41
The northern edge along Market and Mission Streets feature tall buildings as does the more intensely-developed commercial areas east of Fourth Street.
Neighborhood commercial rezoning : economic impact assessment 1987
City and County of San Francisco, Department of City Planning
FindingSixty percent have no rear yards or yards which measure less than 25% of the lot depth. scan 148
Sixty percent have no rear yards or yards which measure less than 25% of the lot depth.
FindingNonetheless, dwellings still account for 87% of all upper story uses. scan 148
Nonetheless, dwellings still account for 87% of all upper story uses.
FindingBetween 1979 and 1984, 13 apartment units were legally converted to commercial uses. scan 148
Between 1979 and 1984, 13 apartment units were legally converted to commercial uses.
FindingMore prevalent are business, professional, and medical service offices which account for about 40% of all commercial uses. scan 148
More prevalent are business, professional, and medical service offices which account for about 40% of all commercial uses.
FindingThe approximately 130 buildings in the district are relatively evenly distributed among one-, two-, and three-story structures. scan 148
The approximately 130 buildings in the district are relatively evenly distributed among one-, two-, and three-story structures.
Seismic retrofitting alternatives for San Francisco's unreinforced masonry buildings : socioeconomic and land use implications of alternative requirements 1990
City and County of San Francisco, Department of City Planning
FindingThere is new development in this area, particularly along Market Street towards Civic Center and Van Ness Avenue. scan 33
There is new development in this area, particularly along Market Street towards Civic Center and Van Ness Avenue.
Central freeway alternatives 1997
San Francisco County Transportation Authority
Report recommendationAlternative 3 calls for the freeway to cross above Market Street and touch down at Octavia and Haight. scan 12
Alternative 3 calls for the freeway to cross above Market Street and touch down at Octavia and Haight.
School of the Arts master plan : San Francisco Unified School District : draft environmental impact report 1997
San Francisco Unified School District
FindingIn the vicinity of the project site, Market Street has two lanes in each direction and serves as a major transit corridor. scan 72
In the vicinity of the project site, Market Street has two lanes in each direction and serves as a major transit corridor.
Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco 1998
City and County of San Francisco, Planning Department
BackgroundFor capital cost and phasing reasons, the PTC selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project. scan 80
For capital cost and phasing reasons, the PTC selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project.