What city reports said about Market Street

27 statements from 11 reports, oldest report first.

The page of Market Street · All places in the reports

Matched to this place by name. Quoted from the report. Sorted by a model.

Market Street development : an analysis 1965

City and County of San Francisco, Market Street Design Task Force

  • Report recommendationPublic transit buses operating on the street surface can best operate from the curb lane with bus stops coordinated to provide direct service to subway stations. scan 6
    Public transit buses operating on the street surface can best operate from the curb lane with bus stops coordinated to provide direct service to subway stations.
  • Report recommendationThe need varies along the length of the street, and the final design should recognize this fact. scan 6
    The need varies along the length of the street, and the final design should recognize this fact.

Street and sidewalk-widths and uses 1966

City and County of San Francisco, Transit Task Force

  • Report recommendationReport No. 3 of the Consultants, submitted on June 28, 1965, did develop and recommend such a scheme, identified in that Report as Design Proposal B. scan 20
    Report No. 3 of the Consultants, submitted on June 28, 1965, did develop and recommend such a scheme, identified in that Report as Design Proposal B.
  • Report recommendationThat proposal, refined and studied in more detail than was then possible, is basically Circulation Plan Four- Lanes B as described in the present Report. scan 20
    That proposal, refined and studied in more detail than was then possible, is basically Circulation Plan Four- Lanes B as described in the present Report.
  • Report recommendationThe street cars will be moved underground leaving buses as the only transit vehicles on the street. scan 86
    The street cars will be moved underground leaving buses as the only transit vehicles on the street.
  • FindingThe five lane plan has almost nothing to recommend it either from a traffic, transit, service and delivery or pedestrian point of view. scan 98
    The five lane plan has almost nothing to recommend it either from a traffic, transit, service and delivery or pedestrian point of view.
  • FindingThe four lane Scheme C provides well for pedestrians. It offers some advantages for bus operations which are still questionable, however. scan 98
    The four lane Scheme C provides well for pedestrians. It offers some advantages for bus operations which are still questionable,however.
  • FindingHowever, it is the least desirable plan for pedestrians and from the stand point of improving the appearance of Market Street. scan 98
    However, it is the least desirable plan for pedestrians and from the stand point of improving the appearance of Market Street.

Analysis of operating alternatives for Market Street trolley coach lines 1975

San Francisco Municipal Railway. Transit Planning Section

  • Report recommendationThe present value of that fleet today, using a municipal bond rate of 6 1/2% would be $1,516,563.04. scan 48
    The present value of that fleet today, using a municipal bond rate of 6 1/2% would be $1,516,563.04.
  • Report recommendationAlternative C would install an additional overhead crossing of Market at Seventh Street, causing visual intrusion at that point. scan 66
    Alternative C would install an additional overhead crossing of Market at Seventh Street, causing visual intrusion at that point.

Annual report 1975

San Francisco Public Utilities Commission. Hetch Hetchy Water and Power Dept

  • FindingPlans and specifications were prepared, and bids received, for constructing manholes and concreteencased duct banks in Market Street between 7th and 8th Streets. scan 44
    Plans and specifications were prepared, and bids received, for constructing manholes and concrete- encased duct banks in Market Street between 7th and 8th Streets.

Market Street planning project, interim report 1984

Public Utilities Commission, City and County of San Francisco

  • Board decision citedResolution No. 160-83, February 1983 scan 2 Board decision
    In February 1983, the San Francisco Board of Supervisors unanimously adopted Resolution 160-83, amending City policy with respect to the Market Street Beautification Project
  • Board decision citedResolution No. 116-68, 1968 scan 3 Board decision
    1968 (Res. 116-68) Adopted a specific design plan for Market Street and adjacent areas which envisioned the elimination of streetcar and trolley bus service
  • BackgroundThe 1968 Plan foresaw Market Street passing through a downtown with four districts identified along its length. scan 5
    The 1968 Plan foresaw Market Street passing through a downtown with four districts identified along its length.
  • FindingTwenty years later, only portions of this grand urban design plan have been achieved. scan 5
    Twenty years later, only portions of this grand urban design plan have been achieved.
  • Report recommendationMinimum lane width for right turning traffic should be 10 feet. scan 11
    Minimum lane width for right turning traffic should be 10 feet.
  • Report recommendationTwo articulated buses, which will be the longest vehicles to be served, require 110 feet of lineal curb space for loading. scan 16
    Two articulated buses, which will be the longest vehicles to be served, require 110 feet of lineal curb space for loading.

South of Market rezoning study : housing, business activity, neighborhood livability, research findings 1985

City and County of San Francisco, Department of City Planning

  • FindingThe northern edge along Market and Mission Streets feature tall buildings as does the more intensely-developed commercial areas east of Fourth Street. scan 41
    The northern edge along Market and Mission Streets feature tall buildings as does the more intensely-developed commercial areas east of Fourth Street.

Neighborhood commercial rezoning : economic impact assessment 1987

City and County of San Francisco, Department of City Planning

  • FindingSixty percent have no rear yards or yards which measure less than 25% of the lot depth. scan 148
    Sixty percent have no rear yards or yards which measure less than 25% of the lot depth.
  • FindingNonetheless, dwellings still account for 87% of all upper story uses. scan 148
    Nonetheless, dwellings still account for 87% of all upper story uses.
  • FindingBetween 1979 and 1984, 13 apartment units were legally converted to commercial uses. scan 148
    Between 1979 and 1984, 13 apartment units were legally converted to commercial uses.
  • FindingMore prevalent are business, professional, and medical service offices which account for about 40% of all commercial uses. scan 148
    More prevalent are business, professional, and medical service offices which account for about 40% of all commercial uses.
  • FindingThe approximately 130 buildings in the district are relatively evenly distributed among one-, two-, and three-story structures. scan 148
    The approximately 130 buildings in the district are relatively evenly distributed among one-, two-, and three-story structures.

Seismic retrofitting alternatives for San Francisco's unreinforced masonry buildings : socioeconomic and land use implications of alternative requirements 1990

City and County of San Francisco, Department of City Planning

  • FindingThere is new development in this area, particularly along Market Street towards Civic Center and Van Ness Avenue. scan 33
    There is new development in this area, particularly along Market Street towards Civic Center and Van Ness Avenue.

Central freeway alternatives 1997

San Francisco County Transportation Authority

  • Report recommendationAlternative 3 calls for the freeway to cross above Market Street and touch down at Octavia and Haight. scan 12
    Alternative 3 calls for the freeway to cross above Market Street and touch down at Octavia and Haight.

School of the Arts master plan : San Francisco Unified School District : draft environmental impact report 1997

San Francisco Unified School District

  • FindingIn the vicinity of the project site, Market Street has two lanes in each direction and serves as a major transit corridor. scan 72
    In the vicinity of the project site, Market Street has two lanes in each direction and serves as a major transit corridor.

Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco 1998

City and County of San Francisco, Planning Department

  • BackgroundFor capital cost and phasing reasons, the PTC selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project. scan 80
    For capital cost and phasing reasons, the PTC selected the Market Street Subway alignment as the initial phase and the Central Subway as the ultimate project.